Forum quick links
slab-on-grade floor
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In Table 5.3 point 5 of annex G of ASHRAE 90.1-2007 I find that for the baseline building performance “opaque assemblies used for new buildings (..) shall confirm with the following common lightwei
Leather
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Agustina Galli on
Hello! We are building a deluxe hotel and the interiorist is willing to use leather coating for room doors.
Tennant HVAC System Unknown
CS-2009 EAc1:Optimize Energy Performanceposted by Marco Marco on
Hi all, I am working on a whole building simulation according to Appendix G. The 10 storey building is divided on 3 tennants.
CS project: How do I know the regularly occupied spaces?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?
How to count interior structural walls
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Alessio Zampaglione on
I found a contrasting information about how to count the interior structural wall.
Would permanent and attached seating count in roof calculations?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Fiorelli on
I have a roof of a building which has a light colored concrete surface and should in theory meet the requirements of the credit.
Absorption chiller in baseline model
NC-2009 EAp2:Minimum Energy Performanceposted by Jens Apel on
Dear all, Sorry in advance for this lengthy thread. In a current (European) project the certifying building will be supplied with district heat from a large city network.
Social meeting residential building terrace FTE/visitors calc.
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nadia Ayala on
Hi everyone, I have a project (residential building) that has a roof terrace with self-service amenities such as kitchenette, chimney, lounge areas, etc.
Renewable Energy Source Summary
Schools-2009 EAp2:Minimum Energy Performanceposted by Sara Goenner Curlee on
I'd like to understand better how to input what is needed in Table L-1 for our solar thermal system (our solar PV system was easy to input).
Building Occupants - Daycare Center
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Iris Amdur on
Our office building includes a daycare center, with approx 100 kids on a daily basis. Would the kids be factored into the calculations using the same method of transportation as their parents?