Forum discussion

CS-2009 EAc1:Optimize Energy Performance

Water feature pumps

We are designing a dry water feature on a campus app guide project. The pumps will be on a limited schedule. How will the pumps be factored into the energy credit? thanks for your help

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 05/09/2012 - 15:35

If they are included within the project boundary they need to be included in the models. The pump energy would be considered process and therefore identical in both models. What is a dry water feature? Just curious.

Wed, 05/09/2012 - 16:24

Dry water fixture has water in storage and runs only upon demand. Ours is a sloped basin with "water tricks." Water does not pool; immediately runs back to storage for recycling.