Forum quick links
How to count interior structural walls
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Alessio Zampaglione on
I found a contrasting information about how to count the interior structural wall.
Would permanent and attached seating count in roof calculations?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Maria Fiorelli on
I have a roof of a building which has a light colored concrete surface and should in theory meet the requirements of the credit.
Absorption chiller in baseline model
NC-2009 EAp2:Minimum Energy Performanceposted by Jens Apel on
Dear all, Sorry in advance for this lengthy thread. In a current (European) project the certifying building will be supplied with district heat from a large city network.
Social meeting residential building terrace FTE/visitors calc.
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nadia Ayala on
Hi everyone, I have a project (residential building) that has a roof terrace with self-service amenities such as kitchenette, chimney, lounge areas, etc.
Renewable Energy Source Summary
Schools-2009 EAp2:Minimum Energy Performanceposted by Sara Goenner Curlee on
I'd like to understand better how to input what is needed in Table L-1 for our solar thermal system (our solar PV system was easy to input).
Building Occupants - Daycare Center
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Iris Amdur on
Our office building includes a daycare center, with approx 100 kids on a daily basis. Would the kids be factored into the calculations using the same method of transportation as their parents?
For Project outside US, Target Finder seems invalid?
CS-2009 EAp2:Minimum Energy Performanceposted by yu-ju Kao on
Our project is located in Asia, and the Target Finder is to compare the project to a US national database, I assumed that it does not work for projects outside US.
Can Atriums or shaded open spaces still qualify for the credit?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ahmed Mosa on
In hot humid climates we tend to shade open spaces or design it as an Atrium, and since it's a "pedestrian oriented accessible space" would this space still qualify for SS C5.2 ?
Pre Development Determination
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jennifer Preston on
Our site was recently demolished, filled with dirt and left for some time.
FSC wood, but not FSC shop. Buy FSC anyway?
CI-2009 MRc7:Certified Woodposted by Valerie Molinski on
We are pursuing MRc7 on a project that I am working on, but the millwork shop does not have a COC certification.