Forum quick links
White polyethylene SRI
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Guillermo T. Adamo on
Hi, We are pursuing the credit by covering 50% of the parking places with a white polyethylene shade cloth of 70% density.
Timing of IAQ testing compliance
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anders Olson on
I am part of a LEED NC 2009 for Retail project that intends to pursue Option 2 -- Air Quality Testing -- for this credit.
Flushout calcs for Option 1 Path 1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Mark Haynie on
To achieve the required time needed for flush out, do we only take into consideration the OA louver volume (CFM)?
EAc1 ASHRAE 90.1-2007 Energy Simulation Model
NC-2009 EAc1:Optimize Energy Performanceposted by Denise Newbould on
Can someone tell me how difficult this modeling software is to use, and how long would it take an engineer who isn’t already familiar with it to get up to speed?
IEQp1 - Occupant diversity
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, We have existing Library project with combined multiple zone and single zone.
Duct Work
CI-2009 MRc3.1:Materials Reuseposted by Holly Himes on
I think I know the answer, but can duct work be counted towards material re-use?
Why IEQc5 Applies to Entire Building?
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Andrew Gil on
No disputing that the requirements of IEQc5 are both sensible and valuable,, so much so that our firm now incorporates these provisions in ALL projects, regardless of LEED certification intent.
Bird Collision Deterrence
Pilot-Credits SSpc55:Bird collision deterrenceposted by Trinidee Shelton on
Our team is attempting this credit and it appears that the bird threat rating calculation does not include any type of tools to determine the threat of an angled glass which was designed to reflect
FSC Mixed split between MRc7 and MRc4
CI-2009 MRc7:Certified Woodposted by Lloyd Johnson on
We are using products sold as FSC Mixed for our cabinetry in our LEED-CI project.
Reused Windows from the Project Building
CS-2009 MRc3:Materials Reuseposted by Christian Brücher on
Hello, following situation: We have a CS project, where we will have a new construction part and a building renovation.