Template is rounding down to 0 daily uses!
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
I have a fixture usage group with 4 FTEs and there's a shower in it. Shower daily uses is 0.1, so the template calculates my total daly uses as 0.1 x 4 = 0.4 and it rounds down to 0.
Tenant requirements to achieve LEED Gold?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Joseph Greene on
Is there an ID or EP point available in CS that would require a tenants to commit to LEED Gold?
Self-ballasted CFLs: additional luminaire wattage?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Zachary Goodnough on
In our project, we have installed a number of Edison base, screw-in CFL bulb, permanent fixtures.
Tenant Lease Agreement
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Curt Pascoe on
Any ideas why the Lease Agreement cannot be used for this prerequisite? Like others here, our building is an empty warehouse with no TI work.
No sorting possible
EBOM-2009 MRp2:Solid Waste Management Policyposted by Lise Dannesboe on
I have a project in a city, where there are no possibilities for sorting, as the municipality only gathers waste in one big chunk.
Industrial process facilities & LEED definition of a building
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Susan Di Giulio on
My question concerns what is and is not a building for LEED purposes. We are currently involved in a LEED NC project on the vast working campus of a regional utility.
Prescriptive Side-lighting Question
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lee Dingemans on
For IEQc8.1 Daylight – Light: While using the prescriptive approach can natural light penetrate into interior building spaces passing through (besides the exterior wall) interior glass wall(s) and
link not active
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Albert Sagrera on
Hello, At the IEQ Credit 4.3 a link to obtain the allowed values of VOC from flooring systems, is not active (http://www.cal-iaq.org/VOC/Section01350_7_15_2004_FINAL_PLUS_ADDENDUM-2004-01.pdf).
Cement Board
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Lauren Fakhoury on
Is cement backer board for tile work required for EQc4.6 compliance? It is technically not gypsum board which is what the credit requires. Thanks!
PNNL Re-Tuning Methodology
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Mike Barker on
How about considering the PNNL Re-Tuning Methodology as a pilot credit ? It is a complete process - techniques and skills - and includes training of staff.