Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

NAUF and FSC

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Kris Phillips  on 

Based on review comments from previous projects, I am under the impression that if you list an item in IEQc4.4, you must also list that same item in MRc7 - although this is not explicit in the v200

4
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Wed Aug 1, 2012, 1:28 pm

Double Parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Beatriz Aruth Sturm  on 

Our parking lot is composed by double parking spaces because of the reduced area.

3
Tue Jul 31, 2012, 8:47 pm

Waste Audits: How To

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Hernando Miranda  on 

In 2002 I reviewed an excellent waste management study and developed a draft compression of the results.

3
Tue Jul 31, 2012, 5:08 pm

Other Services ?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rick Ferrara  on 

I find it odd that a hotel is not listed as an amenity. Does anyone have any history with getting this accepted? What about a gas station and nursery? (The kind with plants, not children).

5
Default Avatar
Director of Sustainability
DCS Design
LEEDuser Basic Member
6 thumbs up
Mon Jul 30, 2012, 7:11 pm

Energy Star classifications

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Maria Vasapollo  on 

Would a college building -full of classrooms, with 1 auditorium go under "Office" or does Energy Star simply not have a category for us?

3
Default Avatar
Senior Project Manager
Johns Hopkins University
LEEDuser Basic Member
0 thumbs up
Mon Jul 30, 2012, 2:33 pm

How to calculate %

CS-2009 EAc2:On-site Renewable Energy
posted by  Emmanuel Pauwels  on 

The reference for the calculation is total energy cost. The output of an array of PV panels is in kwh.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sun Jul 29, 2012, 4:45 pm

ASHRAE 90.1 Exit signs - Mandatory Provisions

CS-2009 EAp2:Minimum Energy Performance
posted by  Bernadette Stauder-Buschlinger  on 

In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.

8
Bilfinger Baugesellschaft m.b.H.
LEEDuser Basic Member
2 thumbs up
Sat Jul 28, 2012, 7:03 am

Example of Thermal Calculation ?

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Eric JS   on 

Dear all, Do you have any example of thermal comfort calculation to satisfy this credit? Thanks and cheers!

3
Default Avatar
Principal
New England Engineering, Inc.
LEEDuser Basic Member
2 thumbs up
Fri Jul 27, 2012, 8:41 pm

Need details for each room?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maura Adams  on 

The review team said we need to highlight and more specifically document the compliance measures for chemical usage areas.

2
Fri Jul 27, 2012, 6:54 pm

Groups in shower facility - multiple bldgs

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Marcio Alberto Casado Pereira  on 

We have a factory of 4 buldings. All the FTEs/users from all buildings will be using the shower facilities of one of the buildings - bldg "P10".

4
Fri Jul 27, 2012, 10:22 am