Forum quick links
EAp2/c1 Metering Requirements Also Earn EAc3.2?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by American University on
If we had to meter things like hot water usage and chillers on a building level to comply with EAp2/c1 to do building-level metering of all incoming energy inputs, would we automatically be able to
U-values soil and vegetation
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, We are working with and energy modeling software that does not have U-values for a soil or vegetated roof. Is there an official list (database) like ASHRAE LEED uses?
"Site energy" usage for a multiple building project
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Chris Miller on
A small site has two office buildings, a storage building and parking lot.
SSCr2 - Option 2 LEED Review
NC-2009 SSc2:Development Density and Community Connectivityposted by Thomas Boyd on
Just received comments back from GBCI regarding our SS credit 2.
Comparison EU energy rating vs Energy Star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Maria Porter on
Please, has anyone done the comparison between Energy Star and the European energy rating system for appliances? Can you share it?
EAc 5.1 for CS tenant spaces
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by charles bell on
Our current design has a Quadlogic multi-tenant smart meter unit in the basement of our mid-rise project. This unit has the capacity for electrical power as well as BTU monitoring.
High cost of energy improvements
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Paulo Pinheiro on
Our building don´t have a good energy efficiency, the commissioning process indicate many ways to obtain a good energy efficiency, we are doing first the low cost way and after the high cost way, b
LPD and EA credit 1
CS-2009 EAc1:Optimize Energy Performanceposted by Alex AC on
I hope everybody is having a great day! I came across this thread and a bunch of questions popped into my head.
HVAC System Baseline modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Henrique Mendes on
I´m not sure if we have modeled the HVAC baseline system correctly. We are in a climate zone 2a (São Paulo - Brazil).
90% minimum purchase compliance during performance period
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Julio Sanchez on
Guys, I have this problem, we have buildings that were recently retrofitted to T8 bulbs but also have several pin based CFL fixtures in our buildings, we are in our second performance period now an