Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

A central atrium

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Biagio Arevalo  on 

I’m planning to approach this credit through the prescriptive path. My building has windows on all four facades. It also has a central atrium that measures 49.20ft x 49.20ft (2.420sf).

2
Tue Nov 13, 2012, 3:51 pm

Lighting density in Shopping Centre mall areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

According to ASHRAE 90.1, power allowance for lighting in mall areas is 18 W/m2 (table 9.6.1).

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Nov 13, 2012, 3:31 pm

gross lighted floor area and no changes to ligting installation

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Adam Targowski  on 

1. I would like to confirm one thing regarding Lighting Power Density Reduction calculations. What is Gross Lighted Floor area that should be used in Building Area Method calculations?

3
Tue Nov 13, 2012, 1:25 pm

No non-incandescent replacement for Purchasing Plan

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Elizabeth Crenshaw Hammitt   on 

We have over 6,000 lamps in our building, and all but 26 have readily available low-mercury/ high efficiency counter parts. The 26 in question are "mini candelabras" ....

3
Mon Nov 12, 2012, 9:28 pm

Tracking in Residence Halls

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  American University  on 

We're working on a LEED Volume prototype for our campus and received this feedback on MRc4: Only up to 10% of the floor area under separate control may be excluded from the calculations, so if resi

3
Mon Nov 12, 2012, 9:15 pm

What Constitutes a Flooring System?

Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Grace Heicher  on 

This may seem like a simple question, but do recessed foot grilles or walk-off matts count as a flooring system?

3
Mon Nov 12, 2012, 4:09 pm

TSS RETENTION

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Albert Sagrera  on 

Hello! We are having a hard time justifying the 80% retention of TSS.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Nov 12, 2012, 11:27 am

Single Stream Waste / Recycling

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Terry Gorski  on 

What would be the best way for a building to document their audit if they contract for single stream waste/recycling?

2
Default Avatar
SVP
Jamestown Development & Construction
LEEDuser Basic Member
0 thumbs up
Sun Nov 11, 2012, 5:35 pm

LEED Excel spreadsheet protected?

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Sara Goenner Curlee  on 

I'm trying to update the LEED daylight spreadsheet but it seems to be protected.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Nov 9, 2012, 5:02 pm

EQUIPMENT CAPACITY OVERSIZING

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

I AM BEGINEER IN THIS FIELD.

3
Fri Nov 9, 2012, 3:22 pm