RP spreadsheet has same credit listed twice.
EBOM-2009 RPc1:Regional Priorityposted by Peter Doo on
The RP credits for the project zip-code shows the same credit reference listed for RP 5 and RP 6. Does this mean that we get 2 RP points if we achieve the double listed credit?
LEED v2009 Minimum energy savings %
NC-2009 EAc1:Optimize Energy Performanceposted by Thomas Hellmann on
Option 1 compliance path indicates the minimum % savings is 10% for new construction. In the LEED v4 comments a mention was made that the threshold was 12% for v2009.
Reactive Penetrating Sealers
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Shane Tohara on
On a CI 2009 project we have slab on grade that was initially poured without a water vapor barrier causing moisture issues in the entire sturcture.We would like to polish the concrete and add Reac
Semi-conditioned spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the definition of "semi-conditioned" spaces.
Task Lighting
CI-2009 IDc1:Innovation in Designposted by Kara Hermann on
Does anyone know of any IDc1 points associated with task lighting? It was listed on the cutsheet, which made me wonder what it could be for.
"Solvent-free" = 0 VOC ?
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Marco Abdallah on
Hi all! The datasheet or manufacuturer advertisement sometimes say that the product is "slovent-free". As paints generally have to solved to be liquid, I guess "solvent-free" in this context means
62MZ calulator spreadsheet with critical zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Sofia Otterheim on
Hello everyone maybe our first question posted here earlier was not so clear. we just want to know how many critical zones should be put into the spreadsheet with each AHU unit ??
Critcal Zone 100% Out Door Air System
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Natascha Altensen on
We are currently confusion regarding a review we received. Our building is a multizone building that is supplied with 100% outdoor air.
RSF & Gross SF
NC-2009 PIf2:Project Summary Detailsposted by Sheela I on
We need to fill in the Gross SF on the LEED PIf2 form. Can we list the RSF specified in the lease for Gross SF?
Steel Extraction Location and Default Recycled Content Questions
Schools-2009 MRc5:Regional Materialsposted by Tim Crowley on