Efficiencies for Packaged VAV with Reheat

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

As HVAC system for baseline I have to model System 5 - Packaged rooftop VAV with Reheat. I wonder what efficiencies I have to consider for the different components.

3
Mon Dec 3, 2012, 8:02 am

WEc1 Water Performance Measurement

EBOM-2009 WEc1:Water Performance Measurement
posted by  Kimberley Riley  on 

Our meter is owned by a 3rd party, the local utility company, it is an electronic meter, however, they only take the reading monthly.

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Sun Dec 2, 2012, 1:05 am

Changing the Building Data Administrator in Portfolio Manager

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Julie Pollack  on 

We are working on a LEED EBOM project and having trouble with changing the Administrator for the building's Energy Star Portfolio Manager.

3
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Fri Nov 30, 2012, 10:42 pm

choosing the CxA for Enhanced Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Marina Andrade  on 

A project we are working on already has a CxA for the Fundamental Comissioning (Independent consultant contracted by the Owner). Can the CxA for the EAc3 be different from the EAp1 CxA?

5
Fri Nov 30, 2012, 9:53 pm

Terrazzo Sealer Question

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Todd Bundren  on 

What is the VOC limit for a Terrazzo Sealer? I'm a bit confused about which category it falls under (Sealer, Floor Coating, or other).

5
Sustainable Design Consultant
LEEDuser Basic Member
51 thumbs up
Fri Nov 30, 2012, 9:45 pm

Existing HVAC within a New HVAC System

CI-2009 EAp2:Minimum Energy Performance
posted by  Nelina Loiselle  on 

I am working on a tenant space in which the HVAC system is going to be completely redone except for one existing HP unit.

3
Default Avatar
Designer
Rinkachung Architecture
LEEDuser Basic Member
1 thumbs up
Fri Nov 30, 2012, 8:40 pm

Janitor room

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Saliha AIT   on 

Hi, I have two options on my project (currently in design stage).

3
LEED AP BD+C
OGER INTERNATIONAL
LEEDuser Basic Member
4 thumbs up
Thu Nov 29, 2012, 1:49 pm

Undergroung parking under a 12 inches water pool

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Carlos Garcia  on 

Dear all We have the 100% of parking spaces undercover, in an underground parking (level -1).

4
Default Avatar
Partner Director
QUARK
LEEDuser Basic Member
3 thumbs up
Thu Nov 29, 2012, 1:42 pm

G3.1.2.10 Exceptions: e.

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

This applies to cooling only type systems? That means if the proposed system can heat and cool and is in said climate zone, then this exception may not be applied. Right?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 29, 2012, 10:35 am

Formwork included?

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Katherine Mariano  on 

Hi All, I am just wondering if formworks are included in the consideration of this credit? - thanks in advance!

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Nov 29, 2012, 3:13 am