Forum quick links
ASHRAE Standard vs ANSI Standard
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ema S on
Do we need to comply with either the ASHRAE Standard vs the ANSI Standard to meet the Prerequisite???? And if so, who is usually the party responsible for documenting the compliance.....it seems th
Combination Campus / On-site approach?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Cara Sloat on
I'm working on a Canadian, CAGBC LEED NC 2009 project that is located with a business park.
Total builtup area calculation for Developemnt density
CS-2009 SSc2:Development Density and Community Connectivityposted by Lavanya Veerappa on
Should the total built up area consider the basemet area as well ?
Submetering of each ECM
NC-2009 EAc5:Measurement and Verificationposted by Jatuwat Varodompun on
Can the submeters for optionD are only provided to cover all ECMs. For instance, if we aim to measure the pump energy, the submetering for the pumps will be provided.
IEQc7.1_Thermal Comfort Design Narrative
NC-2009 IEQc7.1:Thermal Comfort—Designposted by susan eguia on
Hi, We have a library project and we received the review comments from USGBC and requested to provide the following: 1.
Subway stations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Valentin Grimaud on
Hello everyone, we are looking at the feasibility of doing LEED for subway stations.
FTE
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Kasandra Martin on
How do I know what my FTE is? I am guessing it is what I am told the occupancy will be. I am working on a LEED CI, existing building with new addition.
Voltage drop
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Folks, Is there any exception for the 2% and 3% voltage drop? We are working on a subway station and we were able to achieve 3,5% to the feeders and 3% to the to the branch circuits.
Option 1: Shared Lot/Outside LEED Boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by JOHN COOK on
We have a major renovation project where the building shares a small parking lot with three other buildings within a campus setting.
Submetering
NC-2009 EAc5:Measurement and Verificationposted by Jatuwat Varodompun on
For Option D, do we need submetering? and can it be analyzed using only whole building energy? if we required submetering, what level we have to monitored eg HVAC, lighting, process?