Process Loads

CS-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Hi, I know this has been discused before, but I still can´t make it. The thing is that I have a C&S building to model. I have assumed 35 W/m2 of other loads on all tennant spaces, which the sim

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 16, 2013, 12:11 am

Examples of pre-consumer recycled content exclusions

CI-2009 MRc4:Recycled Content
posted by  Michelle Lambert  on 

The given definition of "pre-consumer" recycled content per LEED is "material diverted from the waste stream during a manufacturing process.

5
Tue Jan 15, 2013, 8:32 pm

Tandem parking

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Gabriela Hernández Castillo  on 

If we provide tandem parking within our building (tandem spaces will be used for valet parking), should we leave these out of the total spaces? I mean, lets say I have 50 regular spaces and 50 tan

4
Tue Jan 15, 2013, 8:15 pm

French VOC labeling rule

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  soha yamani  on 

I have an HDF that is which have the following emissions level of TVOC (class valid for the French VOC labeling rule) : Class A Does that make it comply for this credit ?

4
Tue Jan 15, 2013, 7:31 pm

MERV-8 Filtration

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Marcia Weekes  on 

I was under the impression that every LEED project would need to demonstrate use of MERV 8 filtration during construction due to the fact that building commissioning is a prerequisite of LEED and s

2
Tue Jan 15, 2013, 6:59 pm

"Push button" instead of "Occupancy sensor"

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, To benefit from a lighting power reduction, our project is proposing installing push-button switches in the communal stairs. I know that in ASHRAE Appendix G, table G3.2 allows for a 10%

4
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Tue Jan 15, 2013, 12:16 am

Connection to Existing Building

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Eri Spaulding  on 

Credit requirements seem to indicate that 10' long compliant mats are to be located at all "regularly used exterior entrances".

2
Mon Jan 14, 2013, 9:28 pm

Building flush-out of entrance vestibule

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Julie Pollack  on 

During the performance period for LEED EBOM, the building owner is remodeling the main entrance vestibule to the project building.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Jan 14, 2013, 8:22 pm

Urban Core, Urban, SubUrban, Rural Definitions

NC-2009 PIf2:Project Summary Details
posted by  Rebecca Grant  on 

Can anyone point me in the right direction to find definitions on Urban Core, Urban, SubUrban and Rural for Project Information Form 2?

4
Default Avatar
Project Architect
KSQ Architects
LEEDuser Basic Member
28 thumbs up
Sat Jan 12, 2013, 3:34 pm

Building Foot Print

NC-2009 PIf2:Project Summary Details
posted by  renee jimenez  on 

Im working on a Baseball Stadium and am tring to determine what I should use for my Building foot print square footage.

3
Default Avatar
principal
mnk architects
LEEDuser Basic Member
8 thumbs up
Sat Jan 12, 2013, 3:31 pm