Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Form Template Compliance

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Erin Cowan  on 

We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.

2
Sustainable Project Manager
KEMA Services
LEEDuser Basic Member
28 thumbs up
Fri Mar 8, 2013, 10:35 pm

Option 3, share whole bldg energy and water data

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Courtney Royal  on 

Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.

2
Fri Mar 8, 2013, 10:34 pm

Total for Division 12-Reused Furniture Amount PLUS Cost of New??

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  Michelle Bracewell-Musson  on 

The higher the amount for reused furniture, the higher the number for Total Division 12, therefore more difficult to obtain the 30%. Ex.

4
Fri Mar 8, 2013, 10:32 pm

LEED ID for Electric Vehicle Charging Stations

CI-2009 IDc1:Innovation in Design
posted by  Jennifer Berthelot-Jelovic  on 

Is it likely that by providing 5% of the parking with electric vehicle charging stations we will be able to achieve an ID point? If so, how do I got about documenting it?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 8, 2013, 9:31 pm

Lighting control for Barracks sleeping bays

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jeff Koehler  on 

I have a large open sleeping bay for about 30 people. I have 2 rows of lights. Is having each row switched separately good enough for the credit?

2
Fri Mar 8, 2013, 6:11 pm

vegetable oil recycling

NC-2009 IDc1:Innovation in Design
posted by  Emily Hagy  on 

My office is working on a large Multi-building Mixed used NC LEED 2009 project in a urban area. The first floor will have retail space, potentially a few restaurants, and a small grocery store.

3
Director, Sustainable Design Solutions
HDR
LEEDuser Basic Member
25 thumbs up
Fri Mar 8, 2013, 4:56 pm

Password and Zone Floor Area questions

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gabriela Almquist  on 

Hi, I'm trying to add a regularly occupied space (row) in the excel spreadsheet and it gives me an error message saying I do not have permission.

14
Fri Mar 8, 2013, 4:28 pm

Credit Achievement Rate of 0%?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Ron Dean  on 

Hello, At the right of the screen says that 0 of 210 certified projects in C&S earned this credit. I'd like to know why?

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 8, 2013, 3:26 pm

LEED CI for Data center project

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Lavanya Veerappa  on 

Hi, A data centre project that i am working for is applying for LEED CI. We are planning to work on option 1 - prescriptive approach to meet enhanced energy performance.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Mar 8, 2013, 3:05 pm

Standard PV commissioning?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jared Silliker  on 

Does anybody have a standard checklist or list of data points for commissioning a PV system? Related, is it OK for a CxA to ask the PV sub to gather data for Cx purposes vs.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 8, 2013, 1:51 pm