Forum quick links
Form Template Compliance
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Erin Cowan on
We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.
Option 3, share whole bldg energy and water data
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Courtney Royal on
Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.
Total for Division 12-Reused Furniture Amount PLUS Cost of New??
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Michelle Bracewell-Musson on
The higher the amount for reused furniture, the higher the number for Total Division 12, therefore more difficult to obtain the 30%. Ex.
LEED ID for Electric Vehicle Charging Stations
CI-2009 IDc1:Innovation in Designposted by Jennifer Berthelot-Jelovic on
Is it likely that by providing 5% of the parking with electric vehicle charging stations we will be able to achieve an ID point? If so, how do I got about documenting it?
Lighting control for Barracks sleeping bays
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jeff Koehler on
I have a large open sleeping bay for about 30 people. I have 2 rows of lights. Is having each row switched separately good enough for the credit?
vegetable oil recycling
NC-2009 IDc1:Innovation in Designposted by Emily Hagy on
My office is working on a large Multi-building Mixed used NC LEED 2009 project in a urban area. The first floor will have retail space, potentially a few restaurants, and a small grocery store.
Password and Zone Floor Area questions
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Gabriela Almquist on
Hi, I'm trying to add a regularly occupied space (row) in the excel spreadsheet and it gives me an error message saying I do not have permission.
Credit Achievement Rate of 0%?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ron Dean on
Hello, At the right of the screen says that 0 of 210 certified projects in C&S earned this credit. I'd like to know why?
LEED CI for Data center project
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Lavanya Veerappa on
Hi, A data centre project that i am working for is applying for LEED CI. We are planning to work on option 1 - prescriptive approach to meet enhanced energy performance.
Standard PV commissioning?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jared Silliker on
Does anybody have a standard checklist or list of data points for commissioning a PV system? Related, is it OK for a CxA to ask the PV sub to gather data for Cx purposes vs.