LEED online requests the following: Provide date-stamped photos showing the measures taken, including any corrective action, to effectively implement the ESC plan. Include at least 3 photos from at least 3 inspections equally spaced over the site work period. Inspections must occur monthly, at a minimum.
Does the last sentence mean that you need date stamped photos once per month over the entire construction period?