Who can be the CxA?

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ron Dean  on 

I have two specific questions: 1. Just to confirm, is it necessary that the 2 projects of experience for the CxA are LEED certified (or persuing LEED)? 2.

5
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Tue Apr 16, 2013, 7:32 pm

SSc6.2 form

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Michele Otazua  on 

The credit form for SSc6.2 has apparently changed. The table 1 for TSS has been removed, and in its place a description of BMPs is required. Is this the case?

2
Tue Apr 16, 2013, 5:55 pm

May 2011 Addenda - CFC Phaseout Plan

CI-2009 EAp3:Fundamental Refrigerant Management
posted by  Michelle Ruda  on 

In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed. Specifically: Pg.

6
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Tue Apr 16, 2013, 4:22 pm

Recycling Design Guidelines for large projects

ND-v2009 GIBc16:Solid waste management infrastructure
posted by  Lauren Sparandara  on 

I am working on a project with many large buildings (man greater than 600,00 sf). I wanted to advise the client on how much area they should set aside for recycling.

4
Manager, Neighborhood Development
U.S. Green Building Council
LEEDuser Premium Member
41 thumbs up
Tue Apr 16, 2013, 2:57 pm

Value input for “Measured outdoor airflow, CFM”

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Patricia Fuertes  on 

In this prerequisite we are following Case 1 and filling in details in the 2007UM-62MZ Calculator.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Apr 16, 2013, 8:04 am

Design Engineer signature

CI-2009 EAp2:Minimum Energy Performance
posted by  Maria Porter  on 

In a new build which is undergoing certification in CS and CI simultaneously; what person is the Design Engineer? The person who has to sign in EAp2?

3
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Mon Apr 15, 2013, 1:43 pm

Partial Commissioning at the time of submission

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Maya Karkour  on 

Hi, LEED allows to submit for Commissioning if 2 systems are completely commissioned. LEEDOnline differentiates between "Lighting Controls" and "Daylighting Controls".

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Apr 12, 2013, 1:44 pm

IEQc3.2 APPA audit compliance using ISO 90001

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  bayard fenwick  on 

Our client follows ISO 90001 audit guidelines (and has for years). The site team does an internal audit once a month, and conducts an ISO 90001 audit once a year.

2
Fri Apr 12, 2013, 1:19 pm

Calculating Perimeter views for Non-Inpatient Areas IEQ8.2 ?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Olivier Brouard  on 

Hi everyone, I am stuck with something not as straightforward as it sounds like. For IEQ Credit 8.2 LEED Healthcare Supplement provides a table named : 1- Perimeter Non-IPU Area with Window Acce

3
Default Avatar
Sustainable Energy Engineer
LEEDuser Basic Member
0 thumbs up
Thu Apr 11, 2013, 8:32 pm

Multiple CxAs?

CS-2009 EAc3:Enhanced Commissioning
posted by  Michael Kros  on 

Can the commissioning agent listed on the form for EAp1 Fundamental Commissioning be different from the CxA listed on the form for EAc3 Enhanced Commissioning?

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Thu Apr 11, 2013, 7:14 pm