EAp2 for fill and finish plant with labs
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ramon Gomez on
Hi, Our facility is a manufacturing plant (43% fill and finish space) with laboratories (8% space) and refrigerated warehouses (40%).
Does 10-4 Mandatory provision apply for process electric motors?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to the indu
European Project with LEED v4 strategy
NC-2009 MRc2:Construction Waste Managementposted by Jaida Anderson-Lozano on
We have a project in Europe and like many other projects in Europe we are incinerating majority of our construction waste for energy reuse.
Submeter Installation for Data Center in Office Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by devin saylor on
We are experiencing problems with an office building that has a data center. We cannot find a subcontractor that is willing to install submeters on the power output (instead of input).
Sharing "designated" exhaust systems
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Iris Amdur on
Can a project provide one shared exhaust system for two hazardous gas/chemical use areas? Or to comply with the term "designated" does each space needs its own exhaust system?
Breathing Zone definition
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gabriel Moreno on
Hello everyone, I'm confused by a substantial discrepancy between two different definitions that I have come across in regards to Breathing Zone. 1) LEED Definition: "The breathing zone is the re
date stamped photos
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Mike Decoster on
LEED online requests the following: Provide date-stamped photos showing the measures taken, including any corrective action, to effectively implement the ESC plan.
Roofing Adhesives, Sealants & Mastics
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
I am reviewing a LEED submittal for roofing adhesives, sealants and mastics. 1. I am unsure of the categories each primer. Can you help? 2.
VRF HVAC Compliance
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ben Thompson on
We are using a VRF HVAC System at a PK-8 School in Alexandria.
Shading by building and trees
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Terry Jordahl on
To come up with an area of shaded parking, etc, do I just add up the totals of my 10AM Noon and 3PM shadings by trees and buildings?