Forum quick links
How do GBCI reviewers interpret the limits of ASHRAE 55?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Lindsay Austrom on
I just re-read Nadja Turek's earlier comment (from Aug 29, 2012) which included this excerpt from a CIR response: "The metabolic rate for occupants involved in highly physically activity fall outsi
Furniture salvaged from site=Regional Mat+diverted Const. Waste?
Schools-2009 MRc5:Regional Materialsposted by Renee Shirey on
We will be salvaging furniture from a school already on our site, but we are not going for MR3 (Mat. Reuse) due to the limited amount.
Regional Priority SSc7.2 - Heat Island Roof
NC-2009 RPc1:Regional Priorityposted by Catherine Blakemore on
I have completed the SSc7.2 form...successfully it appears and upload the required documentation. Is there additional documentation for the RP credit? We really need the RP point.
Exterior lighting vs. LPB
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
We have a multiple building Project and the LEED Project Boundary of the 4 buildings to be certified do not sum up to be equal do the LEED Campus Boundary, which is according with AGMBC 2010 page 9
ASHRAE Baseline Model Question
NC-2009 EAp2:Minimum Energy Performanceposted by Nan ZHANG on
Dear all, I'm establishing a baseline model for an office building in ASHRAE climate zone 6. The HVAC system of the proposed building only has heating radiators using municipal supplies for winter
Interior blinds under LEED 2009 NC
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Olivier Brouard on
Hi Everyone, I have seen two answers so far, so I will ask again, sorry. Are interiors blinds a valid option under LEED 2009 NC to reduce the glaring issues when running a daylight simulation wit
Who can be the CxA?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ron Dean on
I have two specific questions: 1. Just to confirm, is it necessary that the 2 projects of experience for the CxA are LEED certified (or persuing LEED)? 2.
SSc6.2 form
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michele Otazua on
The credit form for SSc6.2 has apparently changed. The table 1 for TSS has been removed, and in its place a description of BMPs is required. Is this the case?
May 2011 Addenda - CFC Phaseout Plan
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Ruda on
In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed. Specifically: Pg.
Recycling Design Guidelines for large projects
ND-v2009 GIBc16:Solid waste management infrastructureposted by Lauren Sparandara on
I am working on a project with many large buildings (man greater than 600,00 sf). I wanted to advise the client on how much area they should set aside for recycling.