Hand hygiene sign locations
EBOM-2009 IEQp3:Green Cleaning Policyposted by Sara Fontaine on
We are working on a LEED for Schools project. Can anyone provide clarity on if the hand hygiene notices are only required at the staff/employee sinks to help achieve this credit?
Light Scheduling
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt
LEED online template update
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Crissy Tsai on
Lauren, IEQc6.1 leed online template v4.0 states " Simple on/off switches may only count toward credit compliance for private offices" under the individual controls." This is a new requirement
EA Credit 1 - Using available waste oil for heating
NC-2009 EAc1:Optimize Energy Performanceposted by Charlene Steinman on
My project has unlimited free waste engine oil available.
Restored materials
NC-2009 MRc5:Regional Materialsposted by jaume balana on
Our project scope is an historical building restoration and retrofit. Several items such as windows, doors and floor tiles are removed, restored in a workshop near the site project and returned to
Option 1, Case 1, Stream Channel Protection
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Adi Negara, LEED AP BD+C on
Hi all, We have a new construction project that is to build 30 ha factory, however the owner decided only to pursue LEED certification for the office building site, a small portion of the factory
Capturing rainwater and discharge to the public sewer
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Panupant Phapant on
The FAQ of SSc6.2 (http://www.leeduser.com/credit/NC-2009/SSc6.2#sthash.3UFoAJvd.dpuf) suggests that capturing the rainwater into tanks and discharging it into the public sewers after the rainstorm
Latest Minimum Requirements for IEQc6.1
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathy Wislocky on
I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or mi
Qualifying for MRc3
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Kelly Webb on
Our project (111,000+ sq ft, six story office building) will have an entire floor remodel, lobby entry remodel, and four restroom remodels all occurring during the performance period, albeit not si
EAc2 Submission Requirements
CI-2009 EAc2:Enhanced Commissioningposted by John Steingraeber on
I am very interested in pursuing LEED CI certification for a buildout of my firm's offices. This will be my/our first LEED project.