Hand hygiene sign locations

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Sara Fontaine  on 

We are working on a LEED for Schools project. Can anyone provide clarity on if the hand hygiene notices are only required at the staff/employee sinks to help achieve this credit?

6
Mon Jun 17, 2013, 3:08 am

Light Scheduling

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 14, 2013, 8:08 pm

LEED online template update

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Crissy Tsai  on 

Lauren, IEQc6.1 leed online template v4.0 states " Simple on/off switches may only count toward credit compliance for private offices" under the individual controls." This is a new requirement

5
Fri Jun 14, 2013, 5:19 pm

EA Credit 1 - Using available waste oil for heating

NC-2009 EAc1:Optimize Energy Performance
posted by  Charlene Steinman  on 

My project has unlimited free waste engine oil available.

5
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Fri Jun 14, 2013, 3:03 pm

Restored materials

NC-2009 MRc5:Regional Materials
posted by  jaume balana  on 

Our project scope is an historical building restoration and retrofit. Several items such as windows, doors and floor tiles are removed, restored in a workshop near the site project and returned to

3
Thu Jun 13, 2013, 1:54 pm

Option 1, Case 1, Stream Channel Protection

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Adi Negara, LEED AP BD+C  on 

Hi all, We have a new construction project that is to build 30 ha factory, however the owner decided only to pursue LEED certification for the office building site, a small portion of the factory

5
Thu Jun 13, 2013, 12:27 pm

Capturing rainwater and discharge to the public sewer

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Panupant Phapant  on 

The FAQ of SSc6.2 (http://www.leeduser.com/credit/NC-2009/SSc6.2#sthash.3UFoAJvd.dpuf) suggests that capturing the rainwater into tanks and discharging it into the public sewers after the rainstorm

3
Default Avatar
SCG Cement - Building Materials
LEEDuser Basic Member
13 thumbs up
Wed Jun 12, 2013, 11:26 am

Latest Minimum Requirements for IEQc6.1

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathy Wislocky  on 

I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or mi

2
Wed Jun 12, 2013, 12:08 am

Qualifying for MRc3

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Kelly Webb  on 

Our project (111,000+ sq ft, six story office building) will have an entire floor remodel, lobby entry remodel, and four restroom remodels all occurring during the performance period, albeit not si

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Jun 11, 2013, 10:45 pm

EAc2 Submission Requirements

CI-2009 EAc2:Enhanced Commissioning
posted by  John Steingraeber  on 

I am very interested in pursuing LEED CI certification for a buildout of my firm's offices. This will be my/our first LEED project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jun 11, 2013, 9:39 pm