Forum quick links
Existing 1MW PV Array feeding new LEED Project on Campus
NC-2009 EAc2:On-Site Renewable Energyposted by Greg Kight on
My project is a LEED v2.2 NC 32,000 sf project going for an 'individual' certification on a campus of existing buildings (None others are certfied or pursuing certification).
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello All: Is there any specific requirement from LEED for what the VAV minimum should be during cooling or heating?
Major Renovations Project
NC-2009 SSc1:Site Selectionposted by VICTOR MORENO on
Hi, I am performing a Major Renovation Project that footprint building is equal to Project area site.
EA Cre 4_LEEDonline form
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Adam Targowski on
This credit is listed in Appendix 4 under case C so it should include tenant spaces as well. I have a question regarding filling in the LEEDonline form.
System 6 or System 8?
NC-2009 EAp2:Minimum Energy Performanceposted by Rob Watson on
Our building is 7 floors above ground with a conditioned basement and is about 70K ft2.
Housing Densities and FAR
ND-v2009 NPDp2:Compact developmentposted by Colin Day on
Hello Eliot, I am having a difficult time understanding the language of NPDp2.
VRP calculations for multi-family buildings
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Royal on
Hello, Our building is a multifamily building project and my question is, are we still required to complete the VRP calculations for this prerequisite?
Do transit bays count in property calculation
NC-2009 SSc2:Development Density and Community Connectivityposted by John Edwards on
I have a project that sits atop a subway station and across the street from a major local bus transfer facility, which consists of a lot of open space with bus queing lanes and passenger loading ba
Bio-fuel Boilers
NC-2009 EAc2:On-Site Renewable Energyposted by Martin Meehan on
From my reading of the Reference Manual for this credit it seems that Bio-fuel can only be used to generate electrical power on-site, and not to power bio-fuel boilers for water heating or space he
Sub-consultant to CxA
NC-2009 EAc3:Enhanced Commissioningposted by Lise Dannesboe on
Hi. We have a project over 50.000 sf, where an individual from the Owner is CxA. He would, however, like to hire a sub-consultant to handle some of the work during the construction phase.