green roofs: can they count as regularly occupied space?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Carrie Laurendine on
project has a green roof that is accessible from a lounge. the lounge is a regularly occupied space. seems to me that people using the green roof area should be fair game (?).
Partially Irrigated Site
NC-2009 WEc1:Water Efficient Landscapingposted by William Weaver on
This question is somewhat related to Leah's question dated 1.23.2012, but a different circumstance.
Combined approach to WEc2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Michael Wironen on
We have a project where, through efficient fixtures, we will reduce wastewater (WCs, lavatories, and showers) conveyance by approximately 45%.
Custom wood base - offsite millwork finishes included?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Vince Briones on
Hi all, Just seeking confirmation as a situation pertaining to hardwood floor base.
PV System as part of a Master Site
CS-2009 EAc2:On-site Renewable Energyposted by Ben Tucker on
Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.
Gross Square Footage and Building Footprint.
NC-2009 PIf2:Project Summary Detailsposted by Lynne Martin on
Our project is a one story learning/conference center. In this case is the gross square footage the same as the building footprint?
Testing Exhaust Fans
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by cathy keagle on
Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?
Baseline for hospitals
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?
Data Centers baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi to all: We are modeling a data center under LEED v2009, but we need to show savings in the process loads (servers, UPS and transformers) since the achieved savings in HVAC and lighting systems
Complicated CHW distribution & pump energy
NC-2009 EAp2:Minimum Energy Performanceposted by Charline SEYTIER on
We are facing a complicated CHW distribution in one of our energy model, we have 2 chillers feeding a constant flow primary loop that serve heat exchangers. From the heat exchangers start several