Forum quick links
Base building consumption breakdown
CS-2009 EAc5.1:Measurement and verification - base buildingposted by František Bartoš on
Hello, is there any specification how should be consumption of base building divided and measured?
Distinctions in Design Control
CS-2009 PIf5:Building System Controlposted by Michelle Rosenberger on
What is the distinction between Owner/Developer, Tenant and Lease Amendment?
Question Regarding Process Loads
NC-2009 EAp2:Minimum energy performanceposted by Brian Salazar on
Hello again! We are finalizing our model for a v3 Core and Shell Building Renovation. Our model is telling us that our process loads are under the requisite 25%, 23.66% to be exact.
water treatment outside LEED project boundary
NC-2009 WEc2:Innovative wastewater technologiesposted by Adi Negara, LEED AP BD+C on
Dear all, We have a small LEED project (an office space with landscape) which located inside non-LEED construction project (factory), which will be conducted simultaneously.
Lighting in kWh?
CI-2009 EAc4:Green powerposted by Maria Porter on
The answer to this one might be obvious, but I just can’t see it: EAc4 form says to “Provide numbers that correspond with the information provided in EAp2 and EAc1.3”.
How long must we follow thru on erosion control log?
NC-2009 SSp1:Construction activity pollution preventionposted by Donald Bauman on
Our building and site is complete except for the grass. It was hydro-seeded last week but the grass that has taken is less than 75%.
the area meet the requrement must the same area?
CS-2009 IEQc8.1:Daylight and views - daylightposted by Shenhao Li on
Hi guys Please help me solve below three question 1.LEED Guidance required 75% of all regularly occupied spaces meet the daylight requirements at both 9 a.m.
Filtering requirements
NC-2009 SSc6.2:Stormwater design - quality controlposted by Mike D on
If we capture rainwater and reuse it for irrigation, do we need to show any type of filtering or will this automatically acquire the credit?
PI Form 3 occupancy question, transient student vs retail
NC-2009 PIf3:Occupant and Usage Dataposted by Mike Stopka on
Hello I am submitting for a Multi-Family Residential apartment tower. It has retail space at the ground level.
Remediation prior to project start date
NC-2009 SSc3:Brownfield redevelopmentposted by Lauren Fakhoury on
Does anyone know if LEED defines a project start date for this credit? I am working on a project where there was some ACM identified and abated back in 2009.