Steel manufacturer letter regarding raw materials extraction
NC-2009 MRc5:Regional Materialsposted by Lilian Seow on
Hi, I need help with interpretation with this letter which I'm sure some of you may have the same from the manufacturer.
Daylight control in Kitchen
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Jatuwat Varodompun on
I am working on the restaurant project. For the kitchen with small windows, do I need to provide daylight sensor for this zone and how. thanks
WEp1 - Total Daily Usage Rates
CS-2009 WEp1:Water Use Reductionposted by Krista Wayne on
The comment has come up for several project so far and know that this partiualr problem is going to keep coming up in upcoming projects.
Opaque panels
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Similarly to the situation of this picture http://www.waymarking.com/gallery/image.aspx?f=1&guid=89c50354-3bc4-459b-a423-3b962523167c in the windows that I’m modelling there is a transparent pa
System 7: selection of heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Roberto Oshiro Gama on
I,m working on a project were the proposed building has 2 ground water heat pumps with total capaciyt approx. 2300 kW.
T8 LED light specifications
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Mahbuba Khan AIA, LEED AP BD+C on
To achieve energy efficiency a project in Bangladesh is planning on buying T8 LED lights with following specifications.
Is there no opportunity for ID pt for data sharing in CI retail
Retail-CI-v2009 EAc3:Measurement and verificationposted by Valerie Molinski on
We are pursuing M&V on a CI for retal project. I do not see the option to receive the extra ID credit for the sharing of data that we checked in the PI template.
Tenant Guidelines for Large Project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Abena Darden on
We're currently working on a very large student union building for a major California university, which is in its final design review phase.
PIlot Credit 42
Pilot-Credits PC42:Integrated Processposted by C. Anthony Menefee on
Can you choose to submit for Option 3 (Design Integrated Workshop), but not Option 2 (Concept Design Integrated Workshop)?
Executed Vendor Agreements
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Michelle Rosenberger on
As part of our staffing, we have some external vendors.