LEEDs Clarification

NC-2009 MRc5:Regional materials
posted by  Jessica Sarfaty  on 

Hello, Can you please clarify what regional manufacture % by weight, and Harvest/ Extraction % by weight is?

3
Mon Jan 6, 2014, 3:56 pm

Can a shell be LEED Core and Shell certified without HVAC?

CS-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Lawrence Lile  on 

We are working on a project with two stages. The first stage is a shell building, the second stage is a tenant finish-out. The HVAC system is part of the tenant finish-out stage.

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Jan 6, 2014, 3:28 pm

Signatory IEQc 4.1, 4.2 and 4.4

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Albert Sagrera  on 

I would like to know if the signature of the form must be of the owner of the building, or if it could be of the constructor. Thanks

4
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Mon Jan 6, 2014, 3:23 pm
2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Jan 2, 2014, 8:20 pm

Timing of the post occupancy commissioning

CS-2009 EAc3:Enhanced commissioning
posted by  R Jones  on 

Our project is a C&S project and we have a CXa onboard overseeing the commissioning process during design and construction.

3
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Thu Jan 2, 2014, 4:10 pm

Envelope Commissioning

NC-2009 IDc1:Innovation in design
posted by  Mike Decoster  on 

Would like to get some opinions on whether Envelope Commissioning would count as one of the 3 exemplary performance ID credits or Innovation in Design?

10
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Jan 2, 2014, 4:06 pm

District Energy and LEED Boundary

NC-2009 EAc1:Optimize energy performance
posted by  Mitch Gascoyne  on 

I have a LEED 2009 project where all buildings are pursuing LEED certification and are served by the same plant (for heating and cooling).

3
Default Avatar
Sustainability Consultant
MCW Consultants Ltd
LEEDuser Basic Member
8 thumbs up
Tue Dec 31, 2013, 4:14 pm

NO DENSILY OCCUPIED SPACE IS AT OUR PROJECT

CS-2009 IEQc1:Outdoor air delivery monitoring
posted by  Michael E. Edmonds-Bauer  on 

Our project is a CS building with only a few areas within the reach of control of de developer, basically the building staff offices and they will never reach 25 people per 1000 sqft. Does this me

5
Tue Dec 31, 2013, 3:15 pm

IEQ 8.2 a prerequisite for IEQ 8.1 in LEED NC 2009?

NC-2009 IEQc8.2:Daylight and views - views
posted by  Olivier Brouard  on 

Greetings everyone, and Merry Christmas. I've been interested by the subject in the header, as I have in the past on a project under LEED Healthcare category, in which IEQ 8.2 Views was a prerequi

4
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Dec 30, 2013, 9:52 pm

Can A Project refer to more than one LEED AP BD+C for IDcredit 2

NC-2009 IDc2:LEED Accredited Professional
posted by  James Keohane  on 

Can a project refer to one LEED AP for the Design Review Submission and another LEED AP for the Construction Review Submission? How would we document this?

2
AIA, LEED Fellow
ChicagoGreen
LEEDuser Basic Member
3 thumbs up
Mon Dec 30, 2013, 6:33 pm