Exception b. of G3.1.1 and setpoint temperature
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
Exception b. of G3.1.1 states: “use separate single-zone systems (..) for any spaces that have occupancy or process loads or schedule that differ significantly from the rest of the building”.
Chilled water pumping head > baseline design
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different.
Option 1 plus Option 2?
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Lawrence Lile on
I have a number of products that meet floorscore, but one that meets California Section 01350 but doesn't mention floorscore. Can I mix and match option 1 and 2?
New Product
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Stefanie Smith on
Hello, Has anyone encountered a product that is new on the market and therefore is still in the process of becoming FloorScore Certified?
The missing point
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Cesar Ruiz on
Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.
Collection of regional material information
NC-2009 MRc5:Regional materialsposted by T Ros on
Hello, I would like to know if there is some stardard template to compile the information regarding materials and resorces or even the rest of credit categories. Thank you
About reviewer comment
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Magda Aghababyan on
Hello, We got a reviewer comment saying "Provide a revised plan demonstrating that the cleaning products used on the building exterior and hardscape meet the requirements of IEQc3.3.
Hot desks as regularly occupied space?
NC-2009 IEQc8.1:Daylight and views - daylightposted by Paul Rogers on
Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations.
BMP area for a green roof
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Jamison Hill on
My project features raised green roof beds (6" deep soil) located directly downstream from a tin roof.
Ventilation Effectiveness
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.