Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Exception b. of G3.1.1 and setpoint temperature

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

Exception b. of G3.1.1 states: “use separate single-zone systems (..) for any spaces that have occupancy or process loads or schedule that differ significantly from the rest of the building”.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Oct 23, 2014, 3:13 pm

Chilled water pumping head > baseline design

NC-2009 EAp2:Minimum energy performance
posted by  Victoria Watson  on 

Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Oct 23, 2014, 3:08 pm

Option 1 plus Option 2?

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Lawrence Lile  on 

I have a number of products that meet floorscore, but one that meets California Section 01350 but doesn't mention floorscore. Can I mix and match option 1 and 2?

2
Thu Oct 23, 2014, 3:00 pm

New Product

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Stefanie Smith  on 

Hello, Has anyone encountered a product that is new on the market and therefore is still in the process of becoming FloorScore Certified?

3
Default Avatar
AIA
Stark State College
LEEDuser Basic Member
4 thumbs up
Thu Oct 23, 2014, 2:57 pm

The missing point

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Cesar Ruiz  on 

Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Wed Oct 22, 2014, 7:50 pm

Collection of regional material information

NC-2009 MRc5:Regional materials
posted by  T Ros   on 

Hello, I would like to know if there is some stardard template to compile the information regarding materials and resorces or even the rest of credit categories. Thank you

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Oct 22, 2014, 4:26 pm

About reviewer comment

EBOM-2009 SSc2:Building exterior and hardscape management plan
posted by  Magda Aghababyan  on 

Hello, We got a reviewer comment saying "Provide a revised plan demonstrating that the cleaning products used on the building exterior and hardscape meet the requirements of IEQc3.3.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 21, 2014, 6:25 pm

Hot desks as regularly occupied space?

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Paul Rogers  on 

Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations.

4
Mon Oct 20, 2014, 10:35 pm

BMP area for a green roof

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Jamison Hill  on 

My project features raised green roof beds (6" deep soil) located directly downstream from a tin roof.

4
Senior Director of Certifications
Stok
LEEDuser Expert
177 thumbs up
Mon Oct 20, 2014, 9:06 pm

Ventilation Effectiveness

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Dustin Balton  on 

I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.

4
Mon Oct 20, 2014, 5:21 pm