Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Basement Ventilation exceptional calculations

NC-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

Our project has 4 basements with fresh air, exhaust and circulation fans.

4
Fri Nov 21, 2014, 2:47 pm

Certified Green-e REC - Calculation for Exemplary Performance

NC-2009 EAc6:Green power
posted by  Grace Ming  on 

Hi all, I would like to clarify the requirement of Green Power to achieve the Exemplary Performance credit.

5
Fri Nov 21, 2014, 3:36 am

SSc10 Option 2

Schools-2009 SSc10:Joint use of facilities
posted by  Jim Cook  on 

We have a school project where the district has contracts for use of spaces in the building by outside community organizations.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Thu Nov 20, 2014, 5:30 pm

Wall Tile

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Diana Studer  on 

I am working on a project in Canada that came back with first review commenting on the VOC content of the tile used.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Wed Nov 19, 2014, 11:55 pm

Pilot Credit 88: LEED O+M Starter Kit

NC-v4 INc1:Innovation
posted by  Charalampos Giannikopoulos  on 

In LEED v4 NC, the pilot credit “IPpc88 - LEED O+M Starter Kit” is available to implement for up to 4 points.

2
Sr. Sustainability Project Manager
CodeGreen Solutions
LEEDuser Basic Member
25 thumbs up
Wed Nov 19, 2014, 7:43 pm

EV Charging Stations

CI-2009 IDc1:Innovation in design
posted by  Dominique Arrieta  on 

We have a CI project on a University Campus in which we are trying to get an ID point for the use of charging stations located in nearby parknig structures (various places nearby) to the project ar

2
BASc., LEED AP BD+C, O+M
LeadingGREEN Training and Consulting Inc, Viridis EC LLC
LEEDuser Basic Member
20 thumbs up
Tue Nov 18, 2014, 4:38 am

Non english version

CS-2009 SSc9:Tenant design and construction guidelines
posted by  Belén Valladares López  on 

Hi, I'm working in a C&S project located in Madrid. As tenants should be spanish Do I have to translate the whole document?.

2
Senior Sustainability Manager
YR&G
LEEDuser Basic Member
62 thumbs up
Sun Nov 16, 2014, 4:47 pm

50% of the "building's" electricity -- for Retail??

Retail-CI-v2009 EAc4:Green power
posted by  Erica Downs  on 

Our CI-Retail project accounts for only about 12% of the overall building.

2
Sat Nov 15, 2014, 12:27 am

Whole Building Option C vs Option D

CI-2009 EAc3:Measurement and verification
posted by  Dan Forino  on 

We have a CI project which is in theory occupying 100% of a completely new non LEED, Core & Shell building.

3
Sustainability Consultant
Re:Vision Architecture
LEEDuser Basic Member
0 thumbs up
Fri Nov 14, 2014, 3:01 pm

DHW (Domestic Hot Water) as process load

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

It the project I'm modeling for LEED, the DHW is provided by several electric water heaters located in the the restroom zones. The modeling software is considering this as a stand alone base utilit

4
Fri Nov 14, 2014, 2:50 pm