Forum quick links
Project Boundary
Healthcare-v4.1 LTc2:Sensitive Land Protectionposted by Jordi Castellano on
Good afternoon,
How to get points on Material Ingerident
NC-v4.1 MRc2:Environmental Product Declarationsposted by Nagaraj Sankar on
Hi User ,
One of our project ,20 permanently installed materials are purchased under the EPD credit on one of our projects.
Question about calculating the % of Improvement in Energy Performance - Projec with PV arrays
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear LeedUsers,
In our project we have PV arrays which produce electricity and provide this electricity to the Network.
Question about selecting v4 or v4.1
CS-v4.1 EAc5:Renewable Energyposted by Konstantina Kalliakoudi on
Hello to all users,
The Energy and Atmospere Category has a little bit different structure than in version v4.
Waling Distance 400 m or 800 m?
CS-v4 LTc5:Access to quality transitposted by Stephan Zweig on
Dear all,
1) Does subway station as light rail station count? So there applies the limit of 800 m?
RE: v.4 Core & Shell - RECs as Offsite Power
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Hi LEED user,
We have a C&S project includes retail and office towers with limited space for renewable power generation.
Acoustic Performance Credit for Residences
NC-v4 EQc9:Acoustic performanceposted by Andrew Parise on
Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.
Allocation of User Groups in Elementary Schools
Schools-NC-v4 WEp2:Indoor water use reductionposted by Steven Burke on
Two questions. Question 1: Typically in school projects we have several unisex restrooms without urinals.
Occupancy rates Appendix 2 Daily averages or peak occupancy
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Julio Fernandez Amodia on
Hi there,
I am currently calculating the peak occupancy and daily average occupancy for a mall building.