Forum discussion

CI-v4 EAc2:Optimize energy performance

Modeling DHW system for CI project

Hi, 

I am trying to model the baseline DHW system for a CI project, proposed system is a Domectic Hot water electric system , for baseline when I see G3.1(11) baseline states that where the complete hot water system exists , baseline building design shall reflect the actual system type using actual component  capacities and efficiencies, point 2 states that energy source should be electric, now should I model the DHW system in baseline similar to proposes which is electric or something else?

 

Thanks!

 

Rajat Wadhwa

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 04/03/2023 - 18:31

Yes it should be similar to the proposed electric system.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.