Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Air Quality Testing after completion

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Mike Stopka  on 

Hello I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED.

6
Tue Dec 9, 2014, 9:03 pm

Where do I enter residential units in form?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Maria Porter  on 

My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Dec 9, 2014, 9:59 am

Exemption for Labs

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Amit Ahiel  on 

Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.

5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Dec 8, 2014, 8:41 pm

Link to the v4 Water Calculator

NC-v4 WEp2:Indoor water use reduction
posted by  Dylan Connelly  on 

http://www.usgbc.org/resources/indoor-water-use-calculator

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Dec 5, 2014, 10:24 am

Can Janitor closet be tied to restroom exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Leticia SooHoo  on 

Hello, we are working on a commercial office building project. We are intending to meet the requirements of IEQc5 by providing exhaust to the janitor closets.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Fri Dec 5, 2014, 12:22 am

ANSI/BIFMA Testing Date vs Manufacture Date

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Nicole Schuster  on 

This credit requires that the manufacturing period must be within the certification period.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Dec 4, 2014, 9:40 pm

EAp2 Online form - Table EAp2-1. Space Usage Type -

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, There is a clarification question associated with a reviewer's remark. From the modeling software (Trace 700) reports, the spaces are divided to Regularly occupied and Unconditioned (as

5
Thu Dec 4, 2014, 9:20 pm

Retail Loading docks

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sunayana Jain  on 

According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Dec 4, 2014, 5:10 am

Supplemental Table 1.4 - reviewers comment

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, I've received a comment from a reviewer, that insufficient info regarding VAV reheat terminal units are provided in this table.

3
Wed Dec 3, 2014, 7:17 pm

Views from a single occupancy dorm/bed room

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Nelina Loiselle  on 

Hello, I am working on a dorm project that has some single occupancy bed rooms with access to views.

4
Wed Dec 3, 2014, 1:23 pm