Forum quick links
ASHRAE 90.1:2010 Pipping insulation Table, note d. direct-buried heating and hot-water systems piping
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
HVAC Background Noise Measurement - must be done by Acoustic Consultant?
NC-v4.1 EQc9:Acoustic Performanceposted by Eunice Chong on
Hi fellow LEED experts,
Where to find Evapotranspiration Rates of a location?
NC-v4 WEc1:Outdoor water use reductionposted by Zirjay Villanueva on
In the v4_Outdoor Water Use Reduction Calculator, there is a tab where you need to key in the Monthly Rainfall and Evaportranspiration Rate (ETo) for the location of the project.
Formaldehyde and Urea-Formaldehyde
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Abdulrahman Sherazy on
What I believe is there is a different between the formaldehyde and urea as a unique substances and the composite of urea-formaldehyde.
Lighting Mandatory Provision in Tenant space
CS-v4 EAp2:Minimum energy performanceposted by Teerawat W. on
Our project is a core and shell office. The owners are provided with complete lighting fixtures in the tenant space (shell).
Major Renovation Project- Spaces out of Scope of Work
NC-v4 EQp1:Minimum indoor air quality performanceposted by Zeynep Cakir on
Hello everyone,
My question is related to major renovation projects. Are the spaces not undergoing renovation and out of scope of renovation work exempt from the credit requirements?
Need to get clear Idea about requirement of Enhanced IAQ
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nagaraj Sankar on
In Office space buildings, in Enhanced Indoor Air quality strategies, Interior cross contamination prevention, LEED credit says “need to create negative pressure with respect to adjacent spaces whe
Clear opening width for doors
Pilot-Credits INpc125:Inclusive Designposted by Jennifer Atherton on
Hello,
Does the requirement for 0.91 meter wide interior doors refer to the minimum effective clear width through the doorway?
Credits that require energy metering
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ricardo Filho on
Hi all
hope you are having a great start of 2023!
regional priority credits V4.1 New Construction
NC-v4.1 RPc1:Regional Priorityposted by Angela Loughry on
Hello-