Definition of greenfield site

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Maria Glädt  on 

Hi! We have a site in Nairobi which we try to define as a greenfield or previously developed site.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Jan 15, 2015, 7:03 pm

Perimeter Controls

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Gabriela Mesquita  on 

Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).

6
Wed Jan 14, 2015, 7:23 pm

LEED Boundary / Silt Fencing

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Carrie Laurendine  on 

Currently working on a project that is a large site with an existing building currently on the site.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jan 14, 2015, 6:04 pm

SS C7.2 High albedo roof area -120%?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Soo young No  on 

I have just submitted design submittal. When I calculated the High albedo roof area, it came out to 120%. Can I apply for the examplary credit?

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Tue Jan 13, 2015, 10:45 pm

EBOM on Core and Shell (not LEED) building

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  LEED Pro Consultant  on 

We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.

3
Tue Jan 13, 2015, 8:18 pm

PBE Edifica for EAp2 compliance

CS-2009 EAp2:Minimum Energy Performance
posted by  Mauricio Torres  on 

Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 13, 2015, 3:25 pm

Indoor/Outdoor Pool

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Tom Liebel  on 

We're wrestling with the walkoff mat requirement for a recreation center where there is an indoor/outdoor pool - one end of the pool and the roof retract during clement weather to provide an outdoo

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Jan 12, 2015, 9:15 pm

NC V4: Advanced Energy Metering of Entire Building

NC-v4 EAc3:Advanced energy metering
posted by  Erik Gutierrez  on 

Hello all, I'm looking at metering a new construction building with a single controller.

3
Default Avatar
Mechanical Designer
C&J Technical Solutions and Services, Inc.
LEEDuser Basic Member
0 thumbs up
Mon Jan 12, 2015, 8:19 pm

EAp1-1 Commissioning Report Upload Location Missing

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Sam Stoltze  on 

The new LEED Online interface seems to be missing the ability to upload a commissioning report.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Jan 12, 2015, 4:18 pm

Breakdown of HVAC points

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Hi, for the HVAC Equipment points (5), our project meets the requirements of sections 1.4 and 2.9 of the core performance guide but not 3.10 since the system is constant volume (as most VRF and inv

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jan 12, 2015, 8:10 am