Pre-development Conditions

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Leandro Silva  on 

Greetings Our project is a 30 year old building undergoing a Major Renovation and will be registered as LEED-NC v2009. In calculating pre- and post-development runoff, do we consider the pre-develo

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Jul 3, 2015, 6:26 pm
6
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jul 3, 2015, 6:18 pm

SS 4.4 No New Parking.

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Rezkar Abdulmajeed  on 

I have the first LEED project in a campus. The project will be built on an existing parking lot and no new parking will be added within the LEED project boundary.

5
Fri Jul 3, 2015, 2:16 pm

Fuel Stations for Shared Parking Lot Outside of LEED Boundary

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Mary Kay  on 

Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Jul 3, 2015, 1:39 pm

Additional lighting power density in a retail store

CS-2009 EAp2:Minimum energy performance
posted by  Felipe Duran  on 

Dear All, We are working on a shopping mall project which is pursuing LEED for C&S certification.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jul 2, 2015, 9:05 pm

Shared building electricity meter

EBOM-v4 EAp2:Minimum energy performance
posted by  LEED Pro Consultant  on 

We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in every

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Jul 2, 2015, 8:39 pm

small DES

NC-2009 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

For a preliminary review I modeled a building that is heated and cooled by four geothermal heat pumps that are located in a technical room within the building.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jul 2, 2015, 2:57 pm

Pilot Credit Closed

Pilot-Credits EApc8:Demand response
posted by  Haley Duncan  on 

Hi, It looks like USGBC has closed this pilot credit to NC 2009 projects.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Jul 2, 2015, 1:40 pm

Submitting this point in v2009

EBOM-v4 EQc9:Integrated pest management
posted by  Tracy Smith  on 

I am submitting a project under v2009, but my pest control contractor has been encouraging us to switch to the v4 pest control guidelines instead of the v2009.

2
Program Coordinator
Transwestern Sustainability Services
LEEDuser Expert
5 thumbs up
Fri Jun 26, 2015, 7:57 pm

Upload requirements for EA Cr 4: Enhanced Refrigerant Management

NC-2009 EAc4:Enhanced refrigerant management
posted by  Kathy Wislocky  on 

Hi, I'm hoping to get some feedback on what is actually required to be uploaded in support of table 4-1.

4
Fri Jun 26, 2015, 2:13 am