Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Renewable Energy entered separately in leedonline form?

NC-2009 EAp2:Minimum energy performance
posted by  Maya Karkour  on 

Hello, The thermal modeller scope is limited to detailed design, and at this stage Renewable energy (PV and Solar Water Heating) is still not 100% finalized / decided.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Aug 21, 2015, 6:20 am

MR 5 Regional Materials

NC-2009 MRc5:Regional materials
posted by  Derek Darby  on 

I am fairly new to LEED so please bare with me on this one. We are a manufacturer and sell assembled products to the customer.

6
Default Avatar
Senior Project Manager
Engineering Specialties Co.
LEEDuser Basic Member
0 thumbs up
Thu Aug 20, 2015, 8:12 pm

Renovation project Envelope question

NC-2009 EAc1:Optimize energy performance
posted by  Saju Varghese  on 

I'm not really sure how the envelope should be input in baseline vs. proposed.

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Aug 20, 2015, 5:59 pm

Walk-Off on exterior and interior

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Aaron Levine  on 

An earlier comment said that, "LEED Interpretation #10098 seems to be saying that, if your entry system is at the exterior &/or less than 10 feet long, you will need to write a darned good just

8
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Aug 20, 2015, 2:19 am

2 energy point requirement

NC-2009 EAc1:Optimize energy performance
posted by  Mike Stopka  on 

I just wanted to verify that "Two (2) points mandatory for all LEED for New Construction projects registered after June 26, 2007" rule is no longer in effect. Referring to this: http://www.usgbc.o

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Aug 18, 2015, 2:08 pm

Green Products for Integrated Pest Management Plan

EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management plan
posted by  Yong Lee Low  on 

Hi All, Can I check if the local green certification for products can be used in place of Green Seal products for the integrated pest management plan, as well as other policies, e.g.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 18, 2015, 1:41 am

Must non-potable water sources be used to earn IP credit?

NC-v4 IPc1:Integrative process
posted by  Eesmyal Santos-Brault  on 

It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources.

7
Mon Aug 17, 2015, 8:02 pm

non-aerosol spray adhesives?

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Erin Holdenried  on 

For a non-aerosol spray adhesive, must it comply with SCAQMD 1168 or GS-36?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 17, 2015, 4:41 pm

Extent of Documentation

NC-2009 IEQc8.2:Daylight and views - views
posted by  David Browne  on 

I know from having attempted this credit on other projects that the documentation can be tedious, but I have a current project where it seems ridiculous.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 14, 2015, 3:40 pm

Square Footage for the Decorative Lighting Allowance

CI-2009 EAc1.1:Optimize energy performance - lighting power
posted by  Christopher Shaw  on 

When you claim a lighting allowance for Decorative appearance you get 1 watt/sf.

2
Thu Aug 13, 2015, 10:34 pm