baseboard

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Anastasia Makarenko  on 

Does anyone know how to treat skirting board applying to requirements of this credit? Does it need to be floorscore/ CA section 01350?

2
Products and materials specialist
BuildingGreen
LEEDuser Expert
21 thumbs up
Thu Apr 7, 2016, 9:47 am

What is a wetland or naturally designed pond per credit language

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Landry Watson  on 

Credit language clearly indicates that wetlands and naturally designed ponds can count as long as their sides are vegetated and their gradient no more than 1:4.

3
Assistant Vice President - Sustainability
Alexandria Real Estate Equities
LEEDuser Premium Member
26 thumbs up
Thu Apr 7, 2016, 2:39 am

PC14 closed?

Pilot-Credits PC14:Walkable Streets
posted by  Jens Apel  on 

As stated by Melissa Merryweather below the link to the survey is broken.

5
Default Avatar
Sustainability Team Member
M+A Architects
LEEDuser Basic Member
1 thumbs up
Wed Apr 6, 2016, 10:13 pm

Storm water quality within LEED Boundary

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Muhammad Faisal Azizullah Jaffar  on 

Hello I am currently working on a Golf course community within the middle east and in regards to the various strategies employed on site , there are vagetated filter strips, oil spearators, wet p

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Apr 6, 2016, 8:38 pm

Equipment not listed in the Core Performance Guide

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bethany Beers  on 

I have a chilled beam system and am unsure which efficiency values to use from the options in the Core Performance Guide to show prescriptive compliance.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 6, 2016, 2:23 am

Hourly Data for Rainwater Harvesting Calculation

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Christian Kaltreider  on 

Hello, I need to do a rainwater harvesting analysis for our building.

2
Mon Apr 4, 2016, 5:53 pm

Project GFA excluding underground parking areas?

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Andreas M. Roessler  on 

During the registration process of the project and in the Project Information Form “PI f 2 – Project Summary Details” we were/are asked to indicate the total project gross floor area with an exclus

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 4, 2016, 3:52 pm

How to apply the enhanced commissioning task to existing?

NC-2009 EAc3:Enhanced Commissioning
posted by  Dave Hubka  on 

Hi Scott, We are involved with a major addition to an existing building. We will be certifying the entire building.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sat Apr 2, 2016, 2:22 pm

n/a

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Anastasia Makarenko  on 

Dear all, we have the following situation with one of our projects. The project we are certifying is a laboratory building that is a part of the big existing factory site.

5
Fri Apr 1, 2016, 3:03 pm

District Energy System owned by Government vs. Owner

NC-2009 EAc3:Enhanced Commissioning
posted by  Erin Holdenried  on 

My question is in regard to both EAc3: Enhanced Commissioning and EAc5: Measurement and Verification credits in relation to a District Energy System.

3
Fri Apr 1, 2016, 6:31 am