Bicycle Racks and Shower Rooms in Multi-Occupant Building
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Lisa Granger on
Our project is for an office tenant located on one floor of a 23 story building.
Curtain Wall
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Sara Zoumbaris on
Would a curtain wall be considered exterior wall or glazing for this credit? Thanks!
applicability of Watersense tool to commercial projects?
NC-v4 WEp1:Outdoor water use reductionposted by Tristan Roberts on
I got the following question/comment from a reader who is a landscape architect. Does anyone have any thoughts? Here is the comment:
Greenbuild education session on LCA for LEED v4 on Friday 7th
NC-v4 MRc1:Building life-cycle impact reductionposted by Panu Pasanen on
For those headed to LA Greenbuild and minded to get bit more solid understanding of use and requirements of LCA in LEED context, I'll be co-presenting an education session.
Dorm Lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jordan Altaras on
Hello, I have a question relating to lighting control in dorm rooms: My understanding of credit 6.1 was that 90% of building occupants needed their own lighting control.
INc2 LEED AP - Does LEED Fellow Count?
CI-v4 INc2:LEED Accredited Professionalposted by Mark Gelfo on
for a v4 LEED CI project, the requirements say a team member must hold current LEED ID+C credential.
Documentation Requirements-Access to Quality Transit
CI-v4 LTc3:Access to quality transitposted by Pam Lynch on
Hello, I am currenty studying for the LEED GA exam.
interpolation
NC-v4 LTc5:Access to quality transitposted by sepideh khodadadi on
hi guys i have a question i'd be happy if you can help me with it our project is around 850 meters far from a crowded subway station that can help us achieve up to 5 points but since the distance
10% exemption
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that doesn't hav
Baseline HVAC System Selection
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I have a LEED project that is split up into 3 separate blocks. Each block is made up of mainly office space. On the ground floor there is retail units.