ASHRAE 90.1-2007, 6.5.3.1.1,exception b
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, According to ASHRAE 90.1-2007, 6.5.3.1.1,exception b, individual exhaust fans with motor nameplate kW of 0.75 kW or less could be excluded when estimating Fan system power limitation. Th
Where is form Plf3-1?
NC-2009 PIf3:Occupant and Usage Dataposted by Ileana Schinder on
I'm looking for the form required to comply with "Complex Occupancy" under form PLF3. I have a Rec Center with low full staff occupancy (5) but VERY HIGHT Peak transient occupants (642).
Commingled Reporting / Recording Method
NC-2009 MRc2:Construction Waste Managementposted by Lewis Hewton on
Hello, I understand that a whole of facility commingled recycling rate is acceptable only when the method of recording and reporting is regulated by a local or state government authority. The met
Pilot ACP versus credit
Pilot-Credits MRpc102:Legal Woodposted by Jens Apel on
Just to make dead sure my understanding is correct: The first line in the box under requirements here http://www.usgbc.org/node/10146311?view=language does mean, that a BD+C NC (v2009) project can
HUD DDA Designation
NC-v4 LTc3:High priority siteposted by Nathan Gauthier on
Can any project get this credit if they're in a DDA area? It seems like the DDA only exists to identify areas where additional subsidy is needed for low-income housing.
Drop-off area
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Charlie Popeck on
Can the drop off area be a designated parking space?
ACP and Regional Priority
NC-2009 RPc1:Regional Priorityposted by Joanna Jenkins on
I suspect I know the answer to this, but I'm wondering if others have any experience with earning Regional Priority points having used an Alternate Compliance Path.
"Box" within an exisiting Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Gina Dederer on
Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b
Misc. loads entry in the simulation software
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding Misc.
Eye Wash Basins in a Lab
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Aru Sau on
Would a Eye Wash Basin in a Laboratory be considered as Process Water and should not be included in the credit calculation?