Forum quick links
Furniture reuse
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Marie Miller on
Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?
Space Definition for IAQ Calculations
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi,
We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.
Adjustable luminaries tilt - Option 1 (BUG) Vs Option 2 (Calculation)
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hi,
I would like to clarify how to characterize adjustable luminaires.
Pilot Credit: Procurement of Low Carbon Construction Materials (Cemco Sure-Board)
NC-v4 INc1:Innovationposted by Dejana Harris on
A project pursuing MRpc123 Procurement of Low Carbon Construction Materials is using Cemco Sure-Board, which is a prefabricated fiber cement panel and steel assembly.
Water Restoration Certificates (WRC) Provider
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Jason Biondi on
Besides Bonneville Environmental Foundation (BEF), are there any other provider(s) for Water Restoration Certificates® ?
Do non-contiguous habitat areas qualify?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Jennifer Rennick on
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.
Lights mounted under a photovoltaic canopy
CS-v4 SSc6:Light pollution reductionposted by Samuel Calhoun on
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?
INpc142 Safety First Pilot Credit Arc Re-Entry
EBOM-v4.1 INc1:Innovationposted by Barry Abramson on
Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented for
INpc139 Safety First Pilot Credit - Building Water System Recommissioning
EBOM-v4.1 INc1:Innovationposted by Barry Abramson on
We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic.