Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Furniture reuse

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Marie Miller  on 

Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?

1
Thu Apr 27, 2023, 1:49 pm

Space Definition for IAQ Calculations

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Paula Hernandez  on 

Hi,

We are working on a C&S project. We know that the spaces on the Ground Floor will be Restaurants and Sales spaces.

3
Tue Apr 25, 2023, 4:05 pm

Adjustable luminaries tilt - Option 1 (BUG) Vs Option 2 (Calculation)

NC-v4 SSc6:Light pollution reduction
posted by  Anna Korinkova  on 

Hi, 

I would like to clarify how to characterize adjustable luminaires. 

9
Tue Apr 25, 2023, 6:27 am

Pilot Credit: Procurement of Low Carbon Construction Materials (Cemco Sure-Board)

NC-v4 INc1:Innovation
posted by  Dejana Harris  on 

A project pursuing MRpc123 Procurement of Low Carbon Construction Materials is using Cemco Sure-Board, which is a prefabricated fiber cement panel and steel assembly.

1
Mon May 22, 2023, 12:48 am

Water Restoration Certificates (WRC) Provider

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Jason Biondi  on 

Besides Bonneville Environmental Foundation (BEF), are there any other provider(s) for Water Restoration Certificates® ?

0

Do non-contiguous habitat areas qualify?

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Jennifer Rennick  on 

We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.

0

Lights mounted under a photovoltaic canopy

CS-v4 SSc6:Light pollution reduction
posted by  Samuel Calhoun  on 

Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?

0

INpc142 Safety First Pilot Credit Arc Re-Entry

EBOM-v4.1 INc1:Innovation
posted by  Barry Abramson  on 

Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented for

0

INpc139 Safety First Pilot Credit - Building Water System Recommissioning

EBOM-v4.1 INc1:Innovation
posted by  Barry Abramson  on 

We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic.

0