Forum quick links
MEPCalculator - Process Loads tab
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The abreviation EFLH applied to Garage Fan Power Calculation is unnown to me. Could someone please explain it and also if there are some special provisions related to it, please advice.
Central Energy Plant and Service hot water heating
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Engineer on
My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the pro
IAQ Management Plan - Post construction measures
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Maya Karkour on
Dear all, The LEEDOnline letter template for IEQc3.2 includes a portal to upload the IAQ Management Plan highlighting post-construction IAQ management practices. Is this plan different from the o
Scorecards are needed?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Maki San Miguel Paulson on
1. When I registered for pilot credit 112 for LEED 2009 ID+C CI in February of 2017, there was no explicit credit documentation requirements that listed the need to obtain scorecards for each produ
Car Share on Campus - reserved for building occupants only?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Erica Downs on
I seem to remember a requirement somewhere for the Car Share option that for a campus setting, the vehicles must somehow be reserved for use by the LEED building occupants only.
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Incomplete spaces for solar panel and future process load
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.
Existing Envelop for Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
I am modelling a school building where the new insulation is being added to the existing walls.
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by robert feduik on
Has this calculator been changed for use in NC-v4 EQp1 versus the one used in LEED 2009? For new construction, are there any other prerequisites or credits that require the use of this tool in th
using construction rubble for mine rehabilitation
NC-2009 MRc2:Construction Waste Managementposted by Jutta Berns on
we have a project where the waste management contractor is proposing to use clean construction rubble (non-hazardous rubble, where all recyclable components, eg steel, and hazardous materials have