Ride Share vs Car Share // Alternative Compliance and/or Equivalency
ND-v4 NPDc8:Transportation demand managementposted by Matthew VanSweden on
In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others).
Does a covered non-enclosed ground level vehicle circulation to the lobby contribute to the total site paving area?
NC-v4 SSc5:Heat island reductionposted by Nicholas Chan on
Hi!
Exterior doors/windows in v4.1
NC-v4.1 EQc2:Low-Emitting Materialsposted by Emily Purcell on
Hi all,
Construction IAQ Management Plan during demolition phase?
NC-v4 EQc3:Construction indoor air quality management planposted by Elizabeth Kertesz on
For a major renovation project, should we implement the Construction IAQ Management Plan in our unoccupied building during the demolition phase? The reference guide says to implement the plan
how can attachments (drawings, images) be sent in a CIR?
NC-v4 IPc1:Integrative processposted by Sara BENLOUBA on
Dear Everybody,
TOD No Minimum for Parking
NC-v4 LTc7:Reduced parking footprintposted by Graham Linn on
Hello - I have project placed within a Transit Oriented Development (TOD) Overlay. For this city the zoning code in this overlay now says there is "no minimum" for off street parking.
Creating Baseline building Shell based on ΑSHRAE 90.1-2010 - proposed building walls with more than 40% of glass
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all LEED Users,
My proposed building has following percentage of glass at each orientation:
NE: 90% percentage of glass
SE: 90% percentage of glass
Insulation in Interior walls for Vault Spaces in Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone,