Forum quick links
Is thermal comfort control in an art gallery appropriate?
NC-v4 EQc5:Thermal comfortposted by Margaret Hamilton on
We are working on an art gallery project that has tight environmental requirements within the gallery spaces.
Nonresidential Density (FAR)
NC-v4 LTc4:Surrounding density and diverse usesposted by Sarah Burnett on
Hello! Quick question about the Nonresidential Density (FAR) - Our site is located in the heart of a very dense urban area, the residential density exceeds the requirement and so does the Nonres
Special Needs Student Equipment (Schools 2009)
Pilot-Credits EQpc78:Design for active occupantsposted by Cynthia Kaplan on
Has anyone had success with this pilot credit by including "active" furniture for special needs students?
EApc95 - Alternative Energy Performance Metric questions
NC-2009 EAc1:Optimize Energy Performanceposted by Jamy Bacchus on
This pilot credit includes a XL file with tables B through H to calculate savings in terms of GHGs, site energy, source energy, energy cost, peak demand and "if available": TDV and Primary Energy F
CI for Hospital;
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Ajay Kumar on
This project has about 4 public bus stops located within 1/4 mile of walking distance from project entrance.
Air economizer in baseline model
CS-2009 EAc1:Optimize Energy Performanceposted by Jeff Riggs on
If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi
I believe their is a typo in the reference guide
CI-v4 IPc1:Integrative processposted by Kerry Honsinger on
I believe there is a typo in the ID+C reference guide...My understanding of this credit is that it in no way requires specific site, energy or water improvements, it is just that the possibilities
Stormwater discharged to the Bay
NC-v4 SSc4:Rainwater managementposted by Brightworks Sustainability on
Hi all, I am working on a project located close to the Bay.
HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Vicki Rybl on
The base building for my project is an odd shape and there are a few zones which touch two building walls (for example, a conference room has one window which faces west and three windows which fac
Interior Lighting requirements for plant growth and maintenance
NC-v4 EQc6:Interior lightingposted by Charline SEYTIER on
Hello, We have a project that is considering to install an olive tree in the atrium of the building. To sustain the tree, artificial lighting is required daily, for several hours.