Forum quick links
asphalt impregnated felt underlayment for under wood floor
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
off-gassing of asphalt impregnated felt underlayment for under wood floor. Does anyone have any documented info indicating problems with off-gassing of asphalt impregnated felt underlayment for un
Change form
NC-2009 EAp2:Minimum Energy Performanceposted by Nicolas Martinez Ochoa on
Hi, I am working in an office building. I have completed the “minimum energy performance v2009” spreadsheet, but the project uses the v05 form. Is it possible to change the form to a newer form?
LEED exercise with in a project
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Tota Yun on
We are now 30% construction on a new building, since I am new to LEED, how I can follow and learn LEED requirement, and pursue the ongoing LEED practices on site with contractors?
IEQ 4.1 CAmpus Credit
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by ethen mcmanus on
My project is composed of 10 buildings on a college campus. I know for a fact that IEQ 4.1 credit is a campus credit. My question is: How do I verify this?
Akvifer
NC-v4 EAc5:Renewable energy productionposted by Sara Johansson on
Hello, We have a project located in Sweden. Does an akvifer that stores heating and cooling count as renewable energy? The akvifer has two sides - a cold and a warm.
testing of existing plumbing fixtures
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Erin Holdenried on
We have a project that is undergoing major renovation and most of the existing plumbing fixtures will me maintained, and their flush and flow rates have been tested under the 0.9 bar municipal-supp
Onsite Renewable for 1% of owner controlled annual energy cost.
CS-2009 EAc2:On-site Renewable Energyposted by Dave Hubka on
Hi Marcus, I've recently been asked if we could prorate the "1% renewable" to account for only the owner controlled annual energy consumption cost rather than the total building annual energy cost
Exemplary Performance and Regional Priority
CI-v4 EAc2:Optimize energy performanceposted by Kerry Honsinger on
My reference guide states that this credit is eligible for exemplary performance on the Quick Reference table on page 17. It is also eligible for Regional Priority credit.
Historic site
CS-v4 LTc3:High priority siteposted by Jie Xiong on
Hi I am new to V4. There is a question about this credit. On the RG, page 75 further explanation, says that "project may......indicates has significant historic or cultural value".
Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.