Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Street trees in a winter resort

Pilot-Credits PC14:Walkable Streets
posted by  John Zehren  on 

Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio.

0

Commercial Kitchen

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  José Solis  on 

I have a mixed use office building with the potential for restaurant tenants on the ground floor.

1
Fri Apr 8, 2016, 3:06 pm

existing building modeling

CS-2009 EAp2:Minimum Energy Performance
posted by  Alfonzo Collins  on 

I am modeling an existing building right now. The opaque envelope will be maintained (walls and roof) but the entire inside, all HVAC systems, and windows will be replaced.

1
Sat Apr 9, 2016, 10:18 pm

v2009 Project to comply using Building Automation System?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sara Greenwood  on 

Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m

1
Wed Jan 18, 2017, 1:14 am

Landscaped area

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Dina Ammar  on 

Does an existing landscaped area within a previously developed site count as Greenfield square-footage?

1
Sat Apr 9, 2016, 2:38 pm

Energy Star equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  mingyu Zhang  on 

Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.

1
Tue Aug 16, 2016, 3:02 pm

recessed walk off mat

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Bomin Kim  on 

We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.

1
Thu Apr 14, 2016, 11:29 pm

CUP in group project

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Brightworks Sustainability  on 

I'm working on CI group project that is also using a central utility plant. My understanding is that each building must show compliance individually for lighting power density reduction.

1
Tue Apr 12, 2016, 1:45 pm

Wastewater

NC-2009 WEc3:Water Use Reduction
posted by  Alejandro Macias  on 

I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.

0