Forum quick links
Street trees in a winter resort
Pilot-Credits PC14:Walkable Streetsposted by John Zehren on
Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio.
Commercial Kitchen
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by José Solis on
I have a mixed use office building with the potential for restaurant tenants on the ground floor.
existing building modeling
CS-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am modeling an existing building right now. The opaque envelope will be maintained (walls and roof) but the entire inside, all HVAC systems, and windows will be replaced.
v2009 Project to comply using Building Automation System?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sara Greenwood on
Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Donna Juselis on
deleted
Landscaped area
NC-v4 SSc2:Site development - protect or restore habitatposted by Dina Ammar on
Does an existing landscaped area within a previously developed site count as Greenfield square-footage?
Energy Star equipment
CI-2009 EAp2:Minimum Energy Performanceposted by mingyu Zhang on
Hi All: Our project is a little bit special, so i wonder whether we can get the scores of EAp2-4.
recessed walk off mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Bomin Kim on
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.
CUP in group project
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Brightworks Sustainability on
I'm working on CI group project that is also using a central utility plant. My understanding is that each building must show compliance individually for lighting power density reduction.
Wastewater
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.