Forum quick links
More elaboration on the long-term storage
CI-v4.1 LTc4:Bicycle Facilitiesposted by CRB Sustainability on
We are currently certifying under CI 4.1, and I would like to gain a deeper understanding of the requirements for long-term storage of bikes located outside of the building.
Averaging Facility Rates over Time
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.
Option 2: Emergency Preparedness Planning Red Cross Form Examples
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Julia Manion on
Does anyone have an example of the American Ready Cross 123 Assessment and Facility Description Forms to preview before attempting this credit???
OPR & BOD & Design Document review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dave Hubka on
Fundamental Commissioning requires the CxA to review the OPR and BOD and design documents.
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Nikhita Sapuram on
Most WBLCA software programs do not include product specific data.
Renewable Energy Production
NC-v4 EAp2:Minimum energy performanceposted by Piotr Adamczyk on
Dear All,
Baseline Model for Data center Economizer
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Clarification on Table 403 Usage
Pilot-Credits WEpc147:All-Gender Restroomsposted by Graham Linn on
Hi All - just a bit of confusion - is the language requiring use of Table 403 something that applies to both Options 1 and 2 or just Option 2?
All Gender Restrooms - Extent of Hygiene Product Distribution
NC-v4 INc1:Innovationposted by Summer Minchew on
The All Gender Restrooms Pilot general requirements state: "Facilities should provide means for the distribution of menstruation hygiene products." This is a little vauge, does this mean every all
Schedule for Data Center Load
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?