Additional Source Control and Monitoring; sensor locations

NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategies
posted by  Chris Flint Chatto  on 

Wondering what this credit requires for location of IAQ sensors.  Trying to evaluate for a large, "laboratory-like" project with many spaces that have potential pollutants.  I understand

0

Downstream Implementation of Analysis Outcomes

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Charles Boechler  on 

This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance.

1
Wed May 21, 2025, 7:07 pm

Seed Evaluator Tool Effectiveness?

Pilot-Credits IPpc89:Social equity within the community
posted by  Charles Boechler  on 

Is the Seed Evaluator the best tool for measuring social equity?

0

Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Charles Boechler  on 

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ

0
4
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Wed Aug 16, 2023, 6:06 pm

Interior element reuse in different project

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Nadia Azzam  on 

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).

0

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1:Transportation Performance
posted by  Michael Ling  on 

Good Day ! I would like to ask if anyone experienced that before: 

2
Manager of Existing Building Certifications
Rivion, LLC
LEEDuser Expert
0 thumbs up
Wed Aug 16, 2023, 3:29 pm

Water Calcultion for Commerical ID+C project

CI-v4 WEc1:Indoor water use reduction
posted by  Amgad Khattab  on 

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

1
Thu Aug 17, 2023, 6:03 pm

Lighting Control - Recording Studio

CI-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After

0

Option 2. Prescriptive Compliance

CI-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

kinda embarrassed to ask this one, but here goes...

6
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 15, 2023, 3:51 pm