Active controls and thermal control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Matthew Catterall on
We have a project with both perimeter and interior offices.
DCV vs IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone! I have a project that the system works with outside air demand according to the CO2 sensor.
calculation of material cost
NC-2009 MRc5:Regional Materialsposted by Doreen Kruschina on
Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt
Regularly Occupied Spaces
NC-2009 PIf3:Occupant and Usage Dataposted by Lauren Bellamy on
Hi, I am working on a project under LEED BD+C that has some shell space that will no be outfitted until well after the completion of the construction and LEED documentation.
Long Term Service Contract
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Erin Holdenried on
Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the GBCI reviewer?
Pilot vs v4 Demand Response - Full Automation
Pilot-Credits EApc8:Demand responseposted by Jennifer Wehling on
I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.
Masonry Flash Mastic
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Chris Moore on
Our masonry contractor submitted VOC documentation on Wire-Bond Aqua Flash Mastic with a VOC content of 270 g/L. I am first not sure if this needs to be submitted for IEQc4.1 or not.
How to calculate Squatter Toilet in we p1? and roof garden?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Shenhao Li on
HI, i have 2 questions to ask: 1.Now i have a hotel project in china. In this project, Several squatter toilets(with water tank) are designed and will be constructed in the future.
exceptions and alternative options for vestibules
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
According to 5.4.3.4 (mandatory provision) enclosed vestibules shall protect building entrances that separate the conditioned space from the exterior.
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.