Forum quick links
Peak occupancy considering shifts
NC-2009 PIf3:Occupant and Usage Dataposted by LEED Pro Consultant on
Hello, We are calculating the occupancy in a project that works with shifts.
Product maintenance post certification
NC-2009 MRc4:Recycled Contentposted by Bob Korp on
Certification obtained, site occupied & used - fast forward a couple of years - any reason why Owner can't remove a recycled floor tile he doesn't like and replace it with a product of his choo
Circulation spaces
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Mike D on
Can circulation spaces be included in the Views calculations if they have access to views?
Decreased U-value increased Energy Consumption
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear all, I had a reviewer comment for my basecase walls and floors assemblies that were modeled with U-value higher than the appendix G values by a mistake, however, after correcting
Stand Alone Refrigerators and Freezers to be included in EAc4?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by R Jones on
We have some large commercial catering refrigerators and freezers which are standalone and plugged into a normal power socket rather than integral to the building.
Horse Riding Arena
NC-2009 WEc3:Water Use Reductionposted by Kavita Karmarkar on
Is the water used for bathing horses in a horse riding centre to be included in the water use reduction calculations? If yes, then is it to be under the showers category???
ventilation through docks
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alicja Bieszyńska on
Hi all, I'm working on a distribution center project that intakes the air by docks and exhusts it through fans in the roof.
Dry pre mix mineral based bonding coat
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jovelyn Lagunday on
I am confused how to identify if this products should be considered as Adhesives and Sealants or Paints and Coatings. Need your advise please. Thank you.
Option 2 - CIR's
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Donald Green on
Can anyone who submitted a CIR for Option 2 regarding a campus situation post your results?
Portfolio Manager entries
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by cathy keagle on
Does LEED require the costs of the energy to be entered