Our EBOM 2009 project (registered in late 2011 or early 2012) Score Card indicates that for IEQp1 we are to use the v4 form. I thought we could use the v3 form which may not require us to display the VRP Compliance Calculator. I realize we have to comply with the calculator and have it available if LEED wants to see the calculations. 85% of the systems are constant volume and there are 2 VAV systems (with non recirculating boxes) that are being tested for total OA flow at worst case winter conditions. Is it not easier to document IEQp1 with the v3 form than the v4 form? If we can use the v3 forms how do we get LEED to change the Score Card from v4 to v3?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.