Required Vegetated Area
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.
Exhaust Fans in Production area
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Janna Nash on
For LEED EBOM 2009, IEQp1, are exhaust fan test reports required for every fan or just one per type.
Site-wide measures
CS-v4 SSc4:Rainwater managementposted by Mike D on
If there are rainwater management measures taking place as part of the masterplan surrounding and including the project building but these are not within the LEED project boundary, can those measur
District heating cooling plant off-site
CS-v4 EAc5:Renewable energy productionposted by Mike D on
Under the LEED Core & Shell Version 4, the project will be connected to a district heating and cooling plant. Can this be claimed as a renewable energy source under EAc5?
DES systems
CS-v4 EAc2:Optimize energy performanceposted by Mike D on
If the building is connected to a DES system, do both the DES system as well as the building itself need to be modelled?
Certify a Building Extension
NC-2009 PIf1:Minimum Program Requirementsposted by Anna Ohlmeier on
Hello all, we would like to certify the extension of an already LEED certified building. Do anyone know if there are other regulations or it is possible to extend the first certification?
Retail tenant in a mall
posted by Kate Bubriski on
If I am doing a retail store that is located in a large shopping mall can I use the other items in the mall to fulfill the 10 basic services?
ID point for Green Cleaning- need advice
NC-2009 IDc1:Innovation in Designposted by Tammy Dalton on
I am planning to pursue an ID point for Green Cleaning for a NC v2009 project.
IAQ Flush out-using temporary exhaust systems
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Stella Stella on
Hi, We are proposing a IAQ flush out procedure for our facility which consist of a lot of FCU’s. Due to the FCU’s the flush out procedure is excessively long.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?