The Reference Guide establishes that projects may earn an EP point by demonstrating a minimum 95% reduction in conventional commuting trips while in the leeduser graphic of this credit it is indicated that the percentage of achievement must be only 80% (of single-occupants commuting trips). Is there a mistake or is any other calculation not included in the LEED Reference Guide for Operations and Maintenance?. Thanks so much in advance for any help!!!