Forum quick links
MR5
CS-2009 MRc5:Regional materialsposted by Christine Castellano on
accidentally posted this in MR4 - "this is my first time inputting into LeedOnline - as I cannot find interactive help on that site - I have no idea what to put in the columns where the extraction
Thermal Blocks - HVAC Zones Not Designed
CS-2009 EAc1:Optimize energy performanceposted by MKK LEED on
We are modeling a new construction mall, and I would like to get another perspective on how to approach the zoning. The project will be applying for certification under LEED 2009 Core and Shell.
MR5
CS-2009 MRc5:Regional materialsposted by Christine Castellano on
Steel sub listed 76.60% of raw materials extracted within 500 miles of project, the data he provided for back-up lists 5 different locations where the raw material was extracted but manufacturer ca
Open Space vs. Vegetative Space
NC-v4 SSc3:Open spaceposted by Lorne Mlotek on
I just want to clarify what the difference is between Outdoor Space and Vegetative Space. In this credit we are looking at 30% of total site = Outdoor Space 25% of which (IE.
Does a "no drugs" sign satisfy the intent of this prerequisite?
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Charles Stevenson on
A school project we are working on in MA currently has a "Governor's Alliance 'No Drugs' Target Zone" sign at the entrance to the property.
Locker/Dressing Rooms Exhaust into Parking Garage spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Adriana Hansen on
I would like to know if is acceptable to design the exhaust outlet of locker/dressing rooms directly to a parking Garage space. We have an basement level with dressing rooms adjacent to a parking
Transportation emissions
EBOM-2009 EAc6:Emissions reduction reportingposted by Gabriel Frasson on
Hi I was thinking if transportation emissions are consider in this credit Someone knows ? Thank you!
MRc4 Recycled Content
CS-2009 MRc4:Recycled contentposted by Christine Castellano on
Hi - a masonry subcontractor provided me with the total cost of the CMU block, however, he broke out the recycled content of each component of the CMU, i.e., he gave me the % of cement, fly ash, re
Dishwashing Rooms and Exhaust
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Allyson Pease on
Does anyone know if dishwashing rooms need to meet the exhaust requirements listed in this credit?
"Project boundaries that include other buildings"
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Renaud Gay on
Hello, MPR3 describe situation for "Project boundaries that include other buildings".