Preliminary earthworks before project registration
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Amanda Johnson on
Hello, For complicated planning reasons on a large (probably Campus) project some preliminary earthmovement and demolition will take place soon, but the project is not yet registered.
Offsite restoration for greenfield developments
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marni Punt on
Could anyone confirm if the case 2 addenda (11/3/2010) could be relevant to Greenfield developments as well? What would the documentation that must be submitted be?
Sandy soil
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Rustem Saitov on
Could anyone kindly clarify the following issue: I work with a project on construction of industrial plant.
fitness centre equipment
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Jutta Berns on
We are busy with a fitness centre project and looking to confirm which appliances/equipment we typically would have to include in this credit.
Table 9.4.5 basketball court
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modeling a project where there is an external basketball court, which is illuminated. I’m considering Table 9.4.5 “Lighting power densities for building exteriors” for the baseline model.
Rapid bus
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by K Nakamura on
Can a rapid bus qualify as a "light rail" or "commuter rail"?
any SRI requirements for pavers and roads on site?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Sahar Abi-Ziki on
We are trying to achieve SS.c7.1, we have more then 50% of parking underground.
Bus Stops
NC-v4 LTc5:Access to quality transitposted by Florencia Guggenheim on
Hi, i would like to know in the case i have one bus stop but with different bus lines, can i count de trips from every line or just of one of them? thank you very much!
Air shaft / light well
CS-2009 IEQp1:Minimum IAQ Performanceposted by Angela Saggin on
Hi! We are studying the possibility to certificate a 20 stories residential building with 6 apartments per floor.
Energy Modeling and LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Lisa Abraham on
We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs.