Forum quick links
Core performance path
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Jatuwat Varodompun on
We plan to option 1 equipment efficiency. 1 We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
Natural Ventilation in Baseline?
NC-2009 EAp2:Minimum energy performanceposted by Marina Andrade on
In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal
SSc6.2 in urban areas
CS-2009 SSc6.2:Stormwater design - quality controlposted by BH . on
Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a
District Energy Systems
NC-2009 EAc1:Optimize energy performanceposted by Matt Humphreys on
I have project that is purchasing chilled water from the local utility.
LEED CI - Scope of work required
NC-2009 PIf1:Minimum Program Requirementsposted by Michael Smithing on
Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?
SSc6 - Site Improvement Plan
EBOM-v4 SSc6:Site improvement planposted by Levi Jimenez on
Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur
Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?
Option 2-Air Testing - Building with Phased Completion
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Lilian Seow on
We r building 424 residential units - 46 storeys high tower.
Core performance path
NC-2009 EAc1:Optimize energy performanceposted by Jatuwat Varodompun on
Core performance path We plan go for the option 3 the core performance 1 For Section 2.9 equipment efficiency, We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
Square feet calculation
NC-2009 EAp2:Minimum energy performanceposted by LORENZO ORSENIGO on
Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is