Core performance path

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Jatuwat Varodompun  on 

We plan to option 1 equipment efficiency. 1 We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".

1
Mon Sep 23, 2013, 3:00 pm

Natural Ventilation in Baseline?

NC-2009 EAp2:Minimum energy performance
posted by  Marina Andrade  on 

In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal

1
Mon Sep 9, 2013, 1:41 pm

SSc6.2 in urban areas

CS-2009 SSc6.2:Stormwater design - quality control
posted by  BH .  on 

Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a

1
Mon Nov 4, 2013, 8:10 pm

District Energy Systems

NC-2009 EAc1:Optimize energy performance
posted by  Matt Humphreys  on 

I have project that is purchasing chilled water from the local utility.

1
Mon Sep 9, 2013, 1:52 pm

LEED CI - Scope of work required

NC-2009 PIf1:Minimum Program Requirements
posted by  Michael Smithing  on 

Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?

1
Fri Sep 6, 2013, 3:42 pm

SSc6 - Site Improvement Plan

EBOM-v4 SSc6:Site improvement plan
posted by  Levi Jimenez  on 

Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur

1
Mon Aug 11, 2014, 9:31 pm

Repealed?

Pilot-Credits PC14:Walkable Streets
posted by  Kath Williams  on 

If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?

1
Tue Nov 5, 2013, 5:40 pm

Option 2-Air Testing - Building with Phased Completion

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Lilian Seow  on 

We r building 424 residential units - 46 storeys high tower.

1
Mon Nov 4, 2013, 1:57 am

Core performance path

NC-2009 EAc1:Optimize energy performance
posted by  Jatuwat Varodompun  on 

Core performance path We plan go for the option 3 the core performance 1 For Section 2.9 equipment efficiency, We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".

0

Square feet calculation

NC-2009 EAp2:Minimum energy performance
posted by  LORENZO ORSENIGO  on 

Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is

1
Mon Sep 9, 2013, 2:25 pm